LM-2518
Respond to Customer Requests Within 24 Hours
12 Months for Mechanical Parts and 24 Moths for Nc
Metal
Metal-Cutting CNC Machine Tools
Linear Control
Closed-Loop Control
CNC/MNC
Mid-Range CNC Machine Tools
ISO 9001
New
Container
7300*4542*4798mm
Zhangzhou China
8457103000
Product Description
Technical Data | ||
Model | LM-2518 double column machining center | Mitsubishi M80A |
Worktable | Length x width | 2500x1600mm |
T-slot (Width x No. x Distance) | 22mmx9pcsx180mm | |
Max. loading weight | 7000kg | |
Travel | X axis travel | 2500mm |
Y axis travel | 2000mm | |
Z axis travel | 1000mm | |
Spindle nose to worktable | 150-1150mm | |
Double-column | Distance between two columns | 1800mm |
Guideway (HIWIN-P grade) | X width/ numbers/ blocks | 55mm roller/2pcs/6pcs P grade |
Y width/ numbers/ blocks | 55mm roller/2pcs/6pcs P grade | |
Z Box square guide/numbers | Z Rectangular slide guide ways/2pcs/4pcs P grade | |
Screws (HIWIN-C3 grade) | X/Y/Z screw specific | X:Φ63,P12mm/ Y:Φ50,P10mm/ Z:Φ50,P10mm |
Spindle (JUGANG and Royal/Kenturn ) | Belt spindle speed | 6000rpm |
Spindle motor power | 22/26/35Kw | |
X/Y/Z servo power | 4.5/4.5/4.5Kw | |
Spindle taper | BT50 | |
Feed | X/Y/Z feed speeds | 15/15/15m/min |
X/Y/Z cutting feed | 1-10000mm/min | |
Accuracy | X/Y/Z Positioning accuracy | 0.016mm |
X/Y/Z Repeatability | 0.008mm | |
Tool magazine | Tool quantity | 24T |
Max tool dia. (Full) | 110mm | |
Max tool dia. (Empty) | 200mm | |
Max.tool length | 400mm | |
Max. tool weight | 18kgs | |
T-T time | 3.5sec | |
Working conditions | Electricity | 3Ф380V,50HZ,30KVA |
Temperature | 0-40ºC | |
Relative humidity | ≤90% | |
Air pressure | 5-6 bar and 0.2m³/min | |
Dimension& Weight | Approx.outer dimensions | 7300*4542*4798mm |
Approx. weight | 25.5T |
Standard configuration |
1.Spindle oil chiller |
2.Rigid Tapping |
3.Automatic power off switch |
4.3colors alarm light |
5.Cooling system (cooling pump*2) |
6.Automatic micro lubrication for linears and screws |
7.Separate handwheel(MPG) |
8.Electric box heat exchanger |
9.Fully enclosed sheet metal |
10.BT50-24Tchain type tool magazine |
11.Tool kit |
12.Around spindle coolant and compressed air |
13.Leveling screws and pads |
14.Compressed air blow out through spindle. |
15.Chips disc and water tank |
16.Water gun and compressed air gun |
17.Standard packing |
18.3Axes screw and linear covers |
19.Ethernet interface |
20.USB and CF card interface |
21.Transformer(Specification as requirement) |
22.10.4'' screen LCD |
23.Pedal ladder |
24.Chain type chip conveyor *1 & screw type chip conveyor*2 |
FILES WITH MACHINE:
1.QC report |
2.Machine operation manual |
3.Foundation drawing |
4.Precision testing report |
5.Machine circuit manual |
6.Controller operation manual |
Our advantage:
1. The machine tool beds are all designed and produced by ourselves. The R&D team is from Taiwan and the machine quality is high. In order to obtain domestic policy support, we chose to produce in Zhangzhou, a Taiwanese investment area. The price will be much lower than that of Taiwanese machines.
2. The casting is made of HT300 and processed using the MEEHANITE process. After more than half a year of natural aging, artificial aging, vibration treatment, and internal annealing treatment, the casting has high stability and is not easy to deform; it is manually scraped to ensure accuracy.
3. We can produce five-axis machines. The machine accuracy reaches Acc. VDI 3441 Std. We have 6 bearings (4 in the front and 2 in the rear).
4. The controllers (FANUC, Mitsubishi, Siemens) and spare parts are all brands with the most stable and reliable quality in the world.
5. The advantage of our gantry is that it is one-piece and has strong rigidity. The beams, columns, base and columns are all cast in one piece. Others' gantry is not one-piece but separate.
Remark:
1.Transportation: By sea.
2.Validity: 30 days.
3.Delivery time: Within 45 days after receiving the prepayment.
4.Payment terms:30% T/T in advance, 70% after inspection before shipping.
5.Warranty: 12months non-human made damage for mechanical parts and 24 month non-human made damage for NC controller since customer receiving the machine.
6.Installation and commissioning personnel and days: According to the customer's need, 2 engineers and 1 translator, within 7 days(depends on the actual situation).
7.Engineer Travel, Installation and commissioning expenses: The round-trip tickets and accommodation are all offered by buyer. And the Labor cost are also offered by buyer.



