Innovative Formwork Frames for Easy Install Wall and Column Projects Advanced Modular Formwork Frames for Quick Wall and Column Assembly Steel Frame Formwork
Hunan INNO formwork system is one of the most cost-effective methods for accelerating your construction process. With system, you have several options to fulfill your project requirements.
Product type | 1015 | 2015 | 3015 | 4015 | 5015 | 6015 | 10015 | 12015 |
Width (cm) | 10 | 20 | 30 | 40 | 50 | 60 | 100 | 120 |
Length (m) | 1.5m | |||||||
Panel thickness (mm) | 3mm&5mm |
Characteristics
1 | Shape and Dimensional Accuracy: Formwork ensures that box culverts are molded with precision, adhering to specific dimensions and shapes outlined in engineering and design plans. | |||
2 | Structural Stability: The formwork provides a temporary mold that supports the concrete as it cures, contributing to the overall structural stability and integrity of the box culvert. | |||
3 | Efficient Construction: By using formwork, construction processes become more efficient. Precast elements can be manufactured off-site, reducing on-site construction time and potential disruptions. | |||
4 | Quality Control: Formwork allows for strict quality control measures during the construction process, ensuring that the box culvert meets required standards for strength, durability, and safety. | |||
5 | Cost-Effectiveness: Despite the initial investment in formwork, the overall cost can be lower due to increased efficiency, reduced labor requirements, and minimized material wastage during construction. | |||
6 | Design Flexibility: Formwork can be customized to accommodate various sizes and shapes, providing flexibility in design to meet specific project requirements. | |||
7 | Repeatability and Reusability: Formwork systems can be reused for multiple units of box culverts, particularly in projects with similar specifications, improving cost-effectiveness and minimizing material consumption. |
INNO High-Strength Steel Alloy Formwork is A cost-effective alternative to aluminum formwork
1/3 the cost of aluminum formwork with comparable performance.
Superior compressive, tensile, and flexural strength; stable and deformation-resistant.
Reusable up to 300+ cycles.
Technical specs:
Tensile/Yield Strength: 850 MPa.
65mm border width with 1.5mm thick cold-rolled high-strength steel alloy
Reinforced design for enhanced durability and impact resistance.



High-strength alloy steel formwork is a revolutionary new building formwork. It ismade of high-strength alloy steel, integrally formed, laser-automatically welded, and can be reused 300 times.Its cost is only one-third of that of aluminum alloy formwork, and it can be perfectly connected with the aluminum alloyformwork system, which can completely replace aluminum alloy formwork, shorten the construction period, and greatly reduce the construction cost. High-strength alloy steel formwork is an environmentally friendly building formwork.
Based on the various technical application systems developed by high-strength alloy steel formwork, it can be applied to various building scenes such as standard-layer buildings, non-standard-layer buildings such as basements, and pipe galleries.
Company Introduction:
Hunan INNO New Material Technology Co., Ltd. is a comprehensive building materials engineering service company specializing in climbing scaffolds, disc-lock scaffolding, steel formwork, aluminum formwork.
INNO New Material adheres to the principles of integrity and quality-first, upholding the business philosophy of "customer-centric, service-first." We are committed to providing global clients with premium products and services and look forward to collaborating with partners worldwide to create a brighter future.
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
FAQ
Q1:Are you trading company or manufacturer?
A:We are factory.
Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.
Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.
Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.
Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.