Pneumatic Capacitor Discharge Welder for Nut Bolt Welding

Price Negotiable Compare
Min Order 1 Piece
Shipping From Guangdong, China
Popularity 342 people viewed
Quantity
+-
 

Heron Intelligent Equipment Co., Ltd.

VIP   Audited Supplier 10 years
Profile Certified by SGS/BV
DR-20000-14004
Water Cooling
Manual
Vertical
Projection Welding
Three-Phase Secondary Rectification Welder
40000μf
100kVA
380V/3phase/50Hz
152A
140ka
50%
19/23V
34000n
8L/ Min
1527*1355*2340mm
HERON
Wooden Case
CE, CCC, ISO9001
Guangzhou, China
85152199
Product Description
Pneumatic Capacitor Discharge Welder for Nut Bolt Welding



Welding machine parameter 
Volume of capacitor40000μF
Power Supply380V/3 Phase/50Hz
Rated Capacity100kVA
Max. Primary Current152A
Max. Short Cut Current140KA
Rated Duty Cycle50%
Secondary Empty Votage19/23V
0.5MPa Max Working Pressure34000N
Cooling Water Consumption10L/MIN
Throat Depth272mm
Electrode Arm Gap301mm
Dimension(L*W*H)1527*1355*2340


The welding effection




Company Introduction
Heron own over 56, 000 square meters property; Developed MFDC welding system, Capacitor discharge welding system, three-phase DC welding system; Single phase AC welding system; Offer a complete range of standard resistance welding equipments; And customize automation resistance welding production system with fixture; Pursue high welding technology researching and developing all the time. 

Our productions apply to different field like: Car body production line, automotive part production line, refrigerator compressor welding line, silver tip with copper welding system, hardware welding; Home appliance manufacturer line etc, supplying the high tech and energy saving welding equipment and integrate the working station. 

Our production lines include: Press welders; Manual and robotic welding guns, seam welders, bench welders; Rocker arm welders, flash butt welders, multi gun auto welder with wire feeder; Customized work station, clinch system with BTM Tog-L-Loc; Automatic arc welding stations etc. 







FAQ
1. What's the trade terms? 
A: FOB, EX-Work, CRF

2. What's the payment term? 
A: A. T/T 30% as deposit, 70% should be paid before delivery. 
B. L/C at sight

3. What's the delivery time? 
A: 2-3 months after received 30% deposit. 

4. What's the package way? 
A: Wooden case

5. Which shipment port? 
A: Guangzhou or Huangpu

6. How long is the guarantee? 
A: For one year after customer received the machine. (It's not including the comsumables)




Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA