Product Description
1000tpd dry process cement plant
1. Design basis and conditions
1.1 Locations of the plant:
1.2 Technology way: dry rotate kiln technology
1.3 Production capacity 1000t/d clinker
1.4 Cement variety
42.5 Ordinary Portland Cement: 40%
32.5 Ordinary Portland Cement: 60%
1.5 Site condition
1) Level: ~ m above sea level
2)Ambient temperature:
Annual average temperature/year:
Average temperature in summer: °C
Max. Temperature: °C
Min. Temperature: °C
Relative humidity for max. hot monthly mean: %
Min. rainfall for calendar year: mm
Annual average rainfall: mm
1.7 Seismic intensity
1.8 A plan and flat land is assumed with the soil bearing capacity of
~ kpa/m2
1.9 Wind pressure
Annual average wind speed: m/s
1.11 Clinker module
The contractor can specify the raw material proportioning for raw meal, The average components of clinker must be in conformity with the requirements of clinker module.:
Lime saturation value of clinker:KH=0.89±0.01.
Silica modulus: SM=2.6±0.1.
Alumina iron modulus: IM=1.6±0.1.
2. Scope of proposal
The following contains the subentry list within the scope of all departments designed by our company
Owing to the ambiguity of many documents and deficient information about site and the Owner's requirements, the department design is determined temporarily as follows; Necessary supplement and cancellation will be made with the deeper communication with the Owner.
2.2 The Seller shall supply the main mechanical equipment, electrical and instrument equipment of the production department which will effect the production capacity and economic index.
2.3 The Seller shall provide the technical training for the Buyer's personnel



1. Design basis and conditions
1.1 Locations of the plant:
1.2 Technology way: dry rotate kiln technology
1.3 Production capacity 1000t/d clinker
1.4 Cement variety
42.5 Ordinary Portland Cement: 40%
32.5 Ordinary Portland Cement: 60%
1.5 Site condition
1) Level: ~ m above sea level
2)Ambient temperature:
Annual average temperature/year:
Average temperature in summer: °C
Max. Temperature: °C
Min. Temperature: °C
- Relative Ambient moisture:
Relative humidity for max. hot monthly mean: %
- Rainfall:
Min. rainfall for calendar year: mm
Annual average rainfall: mm
- Characteristics of Raw Materials
1.7 Seismic intensity
1.8 A plan and flat land is assumed with the soil bearing capacity of
~ kpa/m2
1.9 Wind pressure
Annual average wind speed: m/s
1.11 Clinker module
The contractor can specify the raw material proportioning for raw meal, The average components of clinker must be in conformity with the requirements of clinker module.:
Lime saturation value of clinker:KH=0.89±0.01.
Silica modulus: SM=2.6±0.1.
Alumina iron modulus: IM=1.6±0.1.
2. Scope of proposal
2.1 The department scope designed by our company
The following contains the subentry list within the scope of all departments designed by our company
Owing to the ambiguity of many documents and deficient information about site and the Owner's requirements, the department design is determined temporarily as follows; Necessary supplement and cancellation will be made with the deeper communication with the Owner.
- Limestone crush and transportation system;
- Auxiliary material crush and transportation system;
- Limestone Preblending Storage;
- Auxiliary materia storage
- Raw material propo rtioning system;
- Raw material Grinding system
- Raw meal homogenizing;
- Kiln feeding and exhausted gas treatment system
- Preheater
- Rotary kiln
- Cooler
- Clinker storage and transportation system
- Heavy oil storage and transportation system
- Gypsum and additive material storage
- Gypsum and additive material crushing
- Cement proportioning system
- Cement Grinding system
- Cement storage and transportation system
- Cement packer and transportation
- Cement bulk
- No more than 10000V power transforming and distributing station;
- Center control room
- Electric room
- Compressed air station
- Compressed air pipeline
- Water supply and drainage
- Circulation water pond and pump house
- Water supply pipe network
2.2 The Seller shall supply the main mechanical equipment, electrical and instrument equipment of the production department which will effect the production capacity and economic index.
2.3 The Seller shall provide the technical training for the Buyer's personnel