API Drilling Fishing Tools Pear Type Junk Milling for Oil

Price $1200.00 Compare
Min Order 1 Piece
Shipping From Hebei, China
Popularity 323 people viewed
Quantity
+-
 

HEBEI XINHUAFA PETROLEUM MACHINERY CO., LTD.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
Mill Shoe
1 Year
1 Year
Forging
Vertical
Atmospheric Pressure
Alloy
Mill Shoe
Provided
Provided
Energy & Mining
Downhole Fishing
Series 150 Releasing and Circulating Overshot
Blue
Excellent
Fishing Tool
4-1/8′′ to 16′′
Energy & Mining/Petroleum Machinery Parts
XINHUAFA
ALL
China Mainland
84139100
Product Description

Product Description

Description:
Milling shoes can be divided into three kind: flat-bottom (or concave-bottom) milling shoe, guide mill shoe and come mill shoe according to its structure and shape At the milling surface, the carbide particles are built up by welding, which plays a part of self-milling. It is used to mill the fallen substances, such as bolt, nut, tooth wheel, slip dog, fittings for deep-well pump, etc.

Features:

1. Designed and manufactured according to API spec 7-1.
2. It can complete casing window cutting and window repair operations once with regular and smooth window.
3. Milling shoe can be divided into three kind: flat-bottom (or concave-bottom) milling shoe, guide mill shoe.
4. It is used to mill the fallen substances, such as bolt, nut, tooth wheel, slip dog, fittings for

Product Parameters

TypeO.D./inConnetion
API
OAL/in
MX1054-1/8NC233-1/2
MX1144-1/2NC2616
MX1405-1/23-1/2REG27-1/2
MX1526NC3818-1/2
MX1787NC4619
MX1957-43/644-1/2REG21-1/4
MX2158-15/324-1/2REG21-1/4
MX31112-1/46-5/8REG23-27/64
MX406167-5/8REG25-19/32

Related products

Company Profile

 




Hebei Pump Parts Supplier/Mud Pump Parts/Piston Rod

Packaging & Shipping

 


FAQ

1) How can I place order?

A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?

A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.

3) What's the order procedure?

A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?

A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?

A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.



Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA