Industrial OEM CO2 Air Dry Coolers for Power Plant Generator Cooling

Price $26000.00 Compare
Min Order 1 Unit
Shipping From Jiangsu, China
Popularity 472 people viewed
Quantity
+-
 

Changzhou Vrcoolertech Refrigeration Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
1 Year
Air-Cooled
Industrial Water
Open System
Single-speed Fan
Low
Machinery
ISO
New
Provide
Export Package
China
8419500090
Product Description

Product Description

1. Material options

·Heavy-gauge hot-dip galvanized steel is used for unit steel panels and structural elements featuring a zinc aluminium coating.

2. Heat transfer media

·The dry cooler is constructed of staggered and seamless copper tubes (15,9 or 12,7 diameter) with aluminium, rippled and corrugated fins (0,14 or 0,17 thickness). ·2,5 mm fin spacing for optimal air turbulence ·Thick and seamless copper headers and threaded steel connections ·Pressure tested at 15 bar ·Try our options for aggressive environments: special pre-coated anti-corrosion aluminium fins or copper fins (0,2 mm thickness).

3. Air movement system

·Axial fan with exceptionally compact direct drive short integrated motor and fan guard. ·The fan features an impeller and motor and is balanced as a complete unit using dynamic single plane balancing. Balance grade is G6.3. ·Fan and motor totally maintenance free. ·Bearings seals and motor encapsulation for long service life.
ITEMS
Tubes Material Copper, stainless steel
Dimension  9.52mm, 12.7mm, 15.88mm
Fin Material Aluminum, red copper, stainless steel

Case Study

Projects name: Dry cooler for Sweden Garbage industry

 
Customer's request: Outdoor temp -20 to +30 driving all year, Water 10000 liters/houer In temp 80dg Out about 40c, Fan power 400volt 50Hz, Montage on the roof outdoor we have 3" pip up and down, Size inside 20 feet container
 
Our first solution:
Customer's first feedback: This is a plane cooler, I want v type. I want about 2 meter x 5 meter v type. I want to have as big as possible V type. I'm going to montage more hydraulic pumps now. I don't know what I need but pleas offer 1 ho fits in 20 feet container and then I fix the rest here in Sweden. To day we have 10 m3/h, But I can have less if you want. We are cooling water and then oil from the water.
 
Our reply: The cooler we designed is enough to cool the 10m3/h water. Will you increase the flow rate in the future? Of course we can change our design to a V-type cooler.
 
Customer: Yes we will total have 40m3 Water in the future but maybe its better to take 2pc v type for 20m3 Please offer 2pc v type for 20m3/h.
 
Our second solution:

 

Packaging & Shipping

 The normal package is wooden box, if special project we could adjust packing based on detail project requirements.

Company Profile

 

MORE THAN 15 YEARS OF SUCCESS
Changzhou Vrcoolertech Refrigeration Co.,Ltd specializes in researching, manufacturing and exporting Heat Exchangers, Evaporators, Condensers, air cooler and other heat transfer equipments for the varied industries since 2004.

 

 OUR MISSION

We are committed to quality products and services to meet our customer's expectations and the needs of industrials. We are dedicated to our mission and goal and we believe in long term business relationship with our customers which is based on integrity, responsiveness and quality
A STRATEGIC LOCATION
Address: Qingsitang, Henglin Town, Wujin Dist, Changzhou, Jiangsu, China. 
 

The normal package is wooden box. If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request.

FAQ

Q1: What is your strength ?
A: Design and manufacture.

Q2: How long is your delivery time?
A:Different products' production time is different. Generally, it needs 10 to 40 working days.

Q3: What is your terms of payment ?
A:50% TT deposit in advance, 50% TT balance before delivery. We provide Trade Assurance Service. Welcome for more advise.

Q4: How do you guarantee the quality of your products
A: Our products go through layers of inspection from raw materials to production to shipment. First the tube will go through a flaw detection test. The entire tube fin heat exchanger is subjected to pressure test and leak test.

Q5. How to contact with you ?
A: 24hours online from TradeManager, quick answer, or email with us, wechat, skype, whatsapp is available. Select one product and leave message to us

1) We can help buyers design specific products or produce products according to buyers' design.
2) We has exported to many countries,such as Israel, USA, German, Canada etc.
3)Rapid response to your needs: We will reply within 24 hours after receiving you letter. If you have urgent thing, welcome to call us.

4)The Most Efficient Service, Best Quality and Excellent Reputation.
 

Enable GingerCannot connect to Ginger Check your internet connection
or reload the browserDisable in this text fieldRephraseRephrase current sentence2Log in to edit with Ginger× Enable Ginger Cannot connect to Ginger Check your internet connection
or reload the browser Disable Ginger Rephrase Rephrase with Ginger (Ctrl+Alt+E) 2 Log in to edit with Ginger Ginger is checking your text for mistakes... Disable Ginger in this text field Disable Ginger on this website
600/4788 free characters checked.
Go Premium to check longer texts and entire documents
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA