Drill String Stabilizer
on Line Support
1 Year
Forging
Polishing
Vacuum
Alloy
12 1/4
12
2.80
7.99
4
3 3/4" ~36"
3 1/8"~9 1/2"
Spiral Integral Blade Stabilizer
Wisechannel
Plywood Case
API, ISO
Jiangsu
8207509000
Product Description

A drilling stabilizer is a piece of downhole equipment used in the bottom hole assembly (BHA) of a drill string. It mechanically stabilizes the BHA in the borehole in order to avoid unintentional sidetracking, vibrations, and ensure the quality of the hole being drilled.
It is composed of a hollow cylindrical body and stabilizing blades, both made of high-strength steel. The blades can be either straight or spiralled, and are hardfaced for wear resistance
It is composed of a hollow cylindrical body and stabilizing blades, both made of high-strength steel. The blades can be either straight or spiralled, and are hardfaced for wear resistance


Bit Size (in) | Working OD (mm) | End OD of body(mm) | ID (mm) | Length (mm) | Thread code on both ends | |||
Drill string type | Near bit type | |||||||
Top | Down | Top | Down | |||||
6 | 152.2 | 121 | 51 | 1200 | NC38 | 3 1/2 REG | ||
6 1/4 | 158.7 | |||||||
6 1/2 | 165.1 | |||||||
7 1/2 | 190.5 | 159 | 57 | 1600 | NC46 | 4 1/2 REG | ||
7 7/8 | 200 | |||||||
8 3/8 | 212.7 | 159 165 | 71 | 1600 1800 | NC46 NC50 | |||
8 1/2 | 215.2 | 159 165 178 | ||||||
8 3/4 | 222.2 | |||||||
9 1/2 | 241.3 | 178 197 | 1600 | NC50 | NC50 | NC50 | ||
9 5/8 | 244.5 | 1800 | 6 5/8 REG | |||||
9 7/8 | 250.8 | |||||||
12 1/4 | 311.2 | 203 209 | 76 | 1800 | NC56 6 5/8 REG | NC56 6 5/8 REG | NC56 6 5/8 REG | 6 5/8 REG |
16 | 406 | 229 241.3 | 2000 2200 | NC61 7 5/8 REG | NC61 7 5/8 REG | NC61 7 5/8 REG | NC61 7 5/8 REG | |
17 1/2 | 444.5 | |||||||
24 | 609.6 | |||||||
26 | 660.4 | |||||||
28 | 711.2 | |||||||
Note: Stabilizer can be made according to customer's special requirement. |







A: You can contact us by email or social media like WhatsApp on the order detail or place order on line.
Q:How about the payment?
A: For new clients, advance payment(30%-100% of total amount) is required, the balance need to be paid before the delivery after your inspection.
Q:How can I pay you?
A: By T/T (Telegraphic Transfer) or L/C (Letter of Credit). After you receive the PI, you can make the payment through your bank as per the terms mentioned in PI.
Q: What's the order procedure?
A: First we discuss order details, production details by email ,TM or other social media; then we issue you an PI for your confirmation. You will be requested to make full payment or deposit before we go into production.After we get the deposit, we start to process the order. Depending on the products you order, we usually a couple of days or even moths to complete production if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we shall arrange the shipment for you.
Q: How do you deal with defective products received by the clients?
A: If there are some defective items, we usually credit to our customer or replace them in next shipment.