Support
Support
Forging
Polishing
Atmospheric Pressure
Alloy
Float Valve
Black/Red/Customize
7-30 Days
Express, Air, Sea
Container
Standrad
China
84314310
Product Description
Model F/G Type Drill Pipe Float Valve
The float valve prevents drilling fluids, cuttings and metal debris from flowing back up the drill string. When correctly installed on the drill string these valves provide added blowout prevention.The float valve can be used anywhere from top to bottom of the drill string. It's most common location is in the BHA (bottom hole assembly) which includes the bit, and can include a bit sub, near bit stabilizer, other stabilizers, float sub, cross-over sub, mud motor (top sub), drill collar, and the drill pipe. Multiple float valves can be used in one string, although double stacking is not recommended because of possible damage to the float valve in high pressure situations. Instead, separate the valves in different tool joints.
Drill Pipe (DP) Float valves are available for standard service, H2S - 300°F service (HNBR/HSN) and H2S - 400°F service (Viton.)

Type | Dia. of Valve Assembly mm(inch) | Length Of Valve Assembly mm(inch) | Dia. Of Float Recess mm(inch) | Sub Box | Other Popular Connections | ||
Connection API | Depth Of Recess mm(inch) | Conne-ction API | Depth Of Recess mm(inch) | ||||
1R | 42.1(1-21/32) | 149.2(5-7/8) | 42.9(1-11/16) | 2-3/8Reg. | 231.8(9-1/8) | NC23 | 231.8(9-1/8) |
2F-3R | 61.1(2-13/32) | 165.1(6-1/2) | 61.9(2-7/16) | 3-1/2Reg. | 266.7(10-1/2) | NC31 | 260.35(10-1/4) |
3-1/2 F | 79.4(3-1/8) | 254(10) | 80.2(3-5/32) | NC38 | 362.0(14-1/4) | ||
4R | 88.1(3-15/32) | 211.1(8-5/16) | 88.9(3-1/2) | 4-1/2Reg. | 325.4(12-13/16) | NC44 | 331.8(13-1/16) |
5R | 98.4(3-7/8) | 247..7(9-3/4) | 99.2(3-29/32) | 5-1/2Reg. | 374.7(14-3/4) | NC50 | 368.3(14-1/2) |
5F-6R | 121.4(4-25/32) | 298.5(11-3/4) | 122.2(4-13/16) | 6-5/8Reg.. | 431(17) | 5-1/2IF | 431.8(17) |
Type | O.D.(mm) | Bearing Back Pressure | Connection | Drill Pipe (in) |
ZFF127 | φ127 | 35MPa 70MPa | NC38×NC38 | 5″ |
ZFF159 | φ159 | 35MPa 70MPa | NC46×NC46 | 6 1/4″ |
ZFF165 | φ165 | 35MPa 70MPa | NC50×NC50 | 6 1/2″ |
ZFF178 | φ178 | 35MPa 70MPa | NC50×NC50 | 7″ |
ZFF203 | φ203 | 35MPa 70MPa | 6 5/8REG×6 5/8REG | 7″ |
ZFF228.6 | φ228.6 | 35MPa 70MPa | 7 5/8REG×7 5/8REG | 9″ |
ZFF241 | φ241 | 35MPa 70MPa | 7 5/8REG×7 5/8REG | 9 1/2″ |

We shandong yacheng petroleum technology are established in 2003 year, located in Dongying city, shengli oilfield,which is second largest oilfield of China.
Our business scope includes oilfield equipment supply, such as, drilling equipment and spares, wellhead equipment ,oil recovery equipment.
We have been served Sinopec -Shengli oilfield in the last 19 years, established a solid partnership and network with quality OEM factories.
Based on our responsive and responsible engineering & commercial team, we can provide one-stop shop service to our customer, and package plan of procurement which brings added value in terms of delivery time, fair prices, inventory in stock.
We are Looking forward to build up partnership with your company and provide our attentive service to you.
Our business scope includes oilfield equipment supply, such as, drilling equipment and spares, wellhead equipment ,oil recovery equipment.
We have been served Sinopec -Shengli oilfield in the last 19 years, established a solid partnership and network with quality OEM factories.
Based on our responsive and responsible engineering & commercial team, we can provide one-stop shop service to our customer, and package plan of procurement which brings added value in terms of delivery time, fair prices, inventory in stock.
We are Looking forward to build up partnership with your company and provide our attentive service to you.
1) About Packing Inner packing: white box, color boxes (upon request), Outer packing: cartons or pallets
2) Terms of payment: We accept T/T,L/C
3)Terms of Shipment: About 30 days after receiving the advance payment,or according to both parties agreement
4)Ports of shipment: Tianjin,Qingdao, shanghai or other required Port, by sea or air
5)Guarantee: One year since delivery.
6)Inspection: 100% testing before delivery.
2) Terms of payment: We accept T/T,L/C
3)Terms of Shipment: About 30 days after receiving the advance payment,or according to both parties agreement
4)Ports of shipment: Tianjin,Qingdao, shanghai or other required Port, by sea or air
5)Guarantee: One year since delivery.
6)Inspection: 100% testing before delivery.