Aluminium Bobbin Yarn Cutting Metal Tubes Cleaning Waste Thread Recycling Machine

Price $6980.00 Compare
Min Order 1 set
Shipping From Zhejiang, China
Popularity 404 people viewed
Quantity
+-
 

Wenzhou Kewang Machinery Co., Ltd

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
ZGGS420
One Year
CE, ISO9001: 2000
New
Long-Term After Sale Service
350kgs
According to Customers'requirements
5.5kw
0.5MPa-0.8MPa
40-55PCS/Min
Ply-Wooden Boxes
2400*600*1400mm
China
8451500000
Product Description

Product Description

Product Description                                                                                                                                 


Main Technical Parameters: 
 
ModelZGGS420
Diameter Of Bobbin30-120mm (can be customized)
Max Yarn Thickness3-5mm
Cutting Speed40-55pcs/min
Voltage220v/380v
Main Power5.5kw
Weight350kgs
Installing Dimensions2400*600*1400mm

We support machine customization for different sizes of paper/plastic/metal bobbins,
no matter what size just contact me for confirmation.


Peformance And Characteristics: 

This machine is replaced the manual blade or electric hot wire to cut the yarn in the bobbins.
It can cut the yarn in bobbins automatically and quickly. The machne is reasonable structure,
during the process, the bobbins is not damaged, which can operate very simple to put the bobbins yarn into the machine.
It is cut the yarn separate with the bobbins.


Individual switch function
1. set the running speed adjustment switch there is a governor outside the electric box. The governor can control the movement speed of the conveyor belt, and can be adjusted according to the requirements of waste yarn thickness, layer number, density and material.  
2. power of external air compressor of equipment 7.5kw and 10 air purifier (gas storage tank)
3. there are two photoelectric switches on the right side of the electric cabinet to detect whether there is any material on the conveyor belt. When the running switch is turned on, the fault indicating flashing will be displayed and the heat flow gun assembly will always be lifted and the conveyor belt will stop the transmission.  
4. there is an photoelectric switch at the edge of the guide rail in the outlet port. When the equipment is running normally, the number is detected, and the count is displayed in the upper left corner of the control panel.  
5.The equipment must be connected to the ground wire after the power supply.
6.Lubricating oil is added once every three days at the part of the moving guide rail slider of the equipment.  
7.Clean up the internal work before leaving work to ensure that the air cylinder is moving smoothly without waste yarn winding and lubricating oil is added to the slider guide rail the next day.  
8.The residual weft thickness of the yarn pipe is more efficient to operate separately, which regulates the control box governor knob can be used. 


Machine Detail                                                                                                                                            

Applicable Bobbin samples:                                                                                                                     

Standard Packages for exportation:



Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA