Product Description

Product Name | Aluminium Melting Furnace Hot Top Casting Machine Homogenizing Furnace |
Equipment | The utility model is composed of a soaking pit furnace,a cooling chamber, a three-dimensional charging cae and a charging platform |
Capacity | 8-60t |
Furnace | Stationary |
Air Pressure | 65-100KPa |
Temperature Accuracy | ±5ºC |
Energy Consumption of Fuel | Diesel fuel:23-30kg/t aluminum rod Natural gas:25-35m3/t aluminum rod |
Highest Working Temperature | 650ºC |
Highest Temperature Control | 650ºC |

The homogennizing furnace refers to a special homogenizing euquiment for heart treatment after casting aluminum rods,aiing at eliminating the residual stress and the unevenness of the metallographic structure generated during the ingot casting, thereby improving the extrusion processing performance of the post-process and improving the production efficiency.And improve the quality of aluminum profiles.
The complete set of equipment is fully automatic controlled by PLC and touch screen. It can be used for homogenization of extrusion (aluminum rod),and it can also be used for homogenization of calendred ingots.
The complete set of equipment is fully automatic controlled by PLC and touch screen. It can be used for homogenization of extrusion (aluminum rod),and it can also be used for homogenization of calendred ingots.







1. Q:What's the delivery time of your aluminum extrusion machine?
A:For ordinary small-sized machine such as saw, 30 days; middle-sized machine such as heating furnace,
45-50days, for big- sized machine such as cooling system/profile handling system, 60 days. We could also design and make the whole production line for our customer, around 3-6 months.
2. Q:What's your ordinary shipment method?
A:We can deliver the machine by land, or by ocean.
A:For ordinary small-sized machine such as saw, 30 days; middle-sized machine such as heating furnace,
45-50days, for big- sized machine such as cooling system/profile handling system, 60 days. We could also design and make the whole production line for our customer, around 3-6 months.
2. Q:What's your ordinary shipment method?
A:We can deliver the machine by land, or by ocean.