TH02
Online Technical Support, Onsite Training, Onsite
3 Years
Aluminum Handrail Profile
Round
6000 Series
Aluminium Aolly 6000 Series
Anodized,Electrophoresis,Powder Coating
6063
Graphic Design, Total Solution for Projects, Other
Inside or Outside
Modern
Stair Railings / Handrails
Flooring
Aluminum Railing Feet Pipe
Bright Silver, Champagne ,Gold and etc.
Stairs,Balcony,Deck, Balstrades
0.90m Standard Height , Can Be Customized
Anodized,Electrophoresis,Powder Coating
Aluminium Aolly 6000 Series
Easy Assembly
Single Item
10X5X5 Cm
1.000 Kg
OTANA
Single Item
10X5X5 cm
Guangdong, China
Product Description




Name | Aluminium alloy handrail feet pipe 40MM |
Type | TH02 |
Brand | OTANA |
Material | Aluminium aolly 6063-T5 series |
Color | shining silver |
Function | Handrail, balcony, balstrades |
Feature | Highly rust-resistance and anti-oxidation, easy to install, save money on labor and machine |
Usage | Handrail system for community, apartment, villa, shopping mall, school, park, hospital, airport, factory, station, highway, and etc |
MOQ | 500 kgs |


easy to install, save money on labor and machine
good appearance smoothness high wear resistance


Multiple sizes Customization support



Our mold room has over 5000 molds, with more than 2000 molds used for production every month.
Our factory has passed ls09001 international quality system certification and CE 15088 certification.We also have a design department that provides design services to thousands of partners.Our products undergo 100% qualityinspection before delivery,and we believe you will love our quality!




A:Sure, we can send samples to you, but the freight cost will be yours.
Q2.What's the Moo ?
A:The MoQ is depending on each type of product, please contact oursales team to get the information about your interested product.
Q3.Do you accept customized?
A:Yes,customization is supported,welcome sending us samples ordrawings.
Q4.What's your lead time (production time)?
A:It depends on the products,the quantity, and we also need to considerifit's a busy season of the factory.
Usually,the lead time is 15-30 days after we receive the deposit.
Q5.How can I pay, and what's the payment term?
A:We accept L/C orT/T,any other payment methods you can discuss withour sales team.We will charge a 30% deposit first,and the balance willbe paid before loading the container.