Aluminum Panel Formwork Mould for House and High Bulidings Construction

Price $100.00 Compare
Min Order 1 Square Meter
Shipping From Shandong, China
Popularity 361 people viewed
Quantity
+-
 

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
Panel
Available
1 Years
ISO, CE
Steel
Wall Formwork
MACPEX
Standard
China
8480411000
Product Description
ItemsAluminium formwork
1. MaterialAluminium alloy 6061-T6
2.InstallationAfter short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period3-5 days per storey.
4.Machine assistanceDoes not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formworkThe aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering costAs the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stabilityThe load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap valueThe scrap value is about 50% of the new panel.

workshop:


Shipment:

Certificate:
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA