SC200GZ
Construction Hoist /Building Hoist
2T - 3T
40M/Min - 60M/Min
Construction Hoist
Rack and Pinion
Electric Motor
Rack and Pinion
With Attendant
With Deceleration Device
Straight Fractional Door
2000kg
Construction Usage
Stationary
Single Girder
Electric
Rack and Pinion
Assembled
ISO9001: 2000, Ce
New
ANKA
Container Sea Freight Packing
CE,
China
8428
Product Description
ANKA BIG CONSTRUCTION BUILDER HOIST ELEVATOR WITH RACK AND PINION ELEVATOR










ANKA SC200GZ RACK AND PINION HOIST ELEVATOR
Capacity: 2000kg
Cabin dimenison: 3.2 m *1.5 m* 2.5m (L*W*H)
Speed: 0- 60 m/mn
VFD CONTROL
Galvanized mast section
Capacity: 2000kg
Cabin dimenison: 3.2 m *1.5 m* 2.5m (L*W*H)
Speed: 0- 60 m/mn
VFD CONTROL
Galvanized mast section

Technical Data Of Direct Driven Construction Hoist | ||||||
Model | Capacity (kg) | Lifting speed (m/min) | Motor power (kw) | Counter Weight (kg) | ||
Single cage | No counter weight | SC100TD | 1000 | 36 | 2x11 | 0 |
SC120TD | 1200 | 36 | 2x11 | 0 | ||
SC200TD | 2000 | 36 | 3x11 | 0 | ||
Twin cage | No counter weight | SC100/100TD | 2x1000 | 36 | 2x2x11 | 0 |
SC120/120TD | 2x1200 | 36 | 2x2x11 | 0 | ||
SC200/200TD | 2x2000 | 36 | 2x3x11 | 0 |








