ADS18-D3
Yes
18 Months
LCD Digital Display
Direct Connected
Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric Energy Meter
Single-phase
Electronic Meter
Pulse Peak
DIN Rail Energy Meter
Customized
Zhejiang, China
Aoasis
Ads18-D3
Digital Only
0.5%
-25~70ºC
Single Phase Energy Meter
50Hz/60Hz
ISO9001
AOASIS
China
8536200000
Product Description
The meter is designed to measure single-phase, two-wire AC active energy in residential, utility and industrial applications. It is a long-life instrument with high stability, high overload capacity, low power consumption, small size and other advantages.
Basic Function
· Mechanical step register 5+1 or LCD display 6+1
· Bi-directional total active energy measurement, reverse active energy measure in the total active energy
· For LCD display type meter, Energy data can store in memory chip more than 15 years after power off
· Pulse LED indicates working of meter, Passive pulse output with optical coupling isolation 35mm din rail installation
· LCD display with backlight (optional function)
Technical Data
Rate Voltage AC | 110V, 120V, 220V, 230V, 240V (0.8~1.2Un) | ||
Rate Current /Frequency | 5(32)A, 5(40)A, 5(45)A/50Hz or 60Hz ±10% | ||
Connection Mode | Direct Type | Accuracy Class | 1% or 0.5% |
Power Consumption | <1W/10VA | Start Current | 0.004lb |
AC Voltage Withstand | 4000V/25mA for 60s | Over Current Withstand | 30Imax for 0.01s |
IP Grade | IP20 | Executive Standard | IEC62053-21, DIN 43880 |
Work Temperature | -25°C ~70°C | Pulse Output | Passive pulse, 80±5 ms |

![]() | ![]() |
![]() | ![]() |
![]() | ![]() |







Q1. What's the payment term?
A. We accept TT,30% deposit and 70% balance before shipping.
Q2. How's the delivery time ?
A. We depend on different products and different quantities. Generally, it takes about 3-15 days. If the quantity is very large, we need to negotiate.
Q3. Tell me the standard of package?
A. Normally are cartons, but also we can pack it according to your requirement.
Q4.Could you offer Form A or C/O ?
A. It's totally not a problem. We can prepare relative documents to forgin affairs office or other office to apply for thiscertificate.
Q5.Would you accept to use our logo ?
A.If you have good quantity,it absolute no problem to do OEM