Aotai Good Technology U/300-Pet Injection Molding Machine

Price $400000.00 Compare
Min Order 1 Set
Shipping From Zhejiang, China
Popularity 291 people viewed
Quantity
+-
 

Ningbo Beilun Allway Machinery Co., Ltd.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
U/300-PET
Tube Head Injection
Horizontal
Thermoplastic, Tube Head Injection
Screw Type
Hydraulic & Mechanical
Automatic
Computerized
CE, ISO9001:2008
650 mm
70 Kn
1 Year
610 mm
385 L
0 - 160 Rpm, 160
676 Cm3
307 G/S
650*650 mm
25, 25,25,25
843,1004,1178 G
55,60,65 mm
200 - 630 mm
676,805,945 Cm3
18.3 Kw
AOTAI
New
Zhejiang, China
Product Description
AOTAI Good Technology U/300-PET Injection Molding Machine
 
Product Description
Specification
Machine weight
U/300-PET
Screw type
A
B
C
Screw diameter (mm)
55
60
65
Screw L/D ratio (L/D)
25
25
25
Shot volume (theoretical) (CM3)
676
805
945
Injection weight (PVC) (g)
843
1004
1178
Pump max.pressure (Mpa)
16
Pump motor power (servo)(KW)
30(33)
Number of heating area(Segment)
3+1
Machine dimension (L*W*H) (M)
6.55*1.72*2.45
 
 
 
 
1. What kind of plastic material can be used on this machine?
PP, PE, PS, ABS and other general material could be used on this machine.
If you have other special material such as PC, PMMA, PVC, please contact us for further information.
2. What is guarantee time for this machine?
12 months after installation or 18 months again B/L date.

3. What kind of shipping container for this machine?
Containere choose will depends on the different machine size . 20HQ,40HQ,40GP will suitable for different size machine.

4. How much is Engineer service charge?
We can send experienced technician to customer's country for guiding the installation and commission the machine, also train the
customer's employee. Customer need to afford technician visa charge, round trip air ticket expense, accommodation and
transportation in local. Also customer needs to pay USD 80 per days to technician as salary.

5. How long will be for installation and commission this machine?
If customer prepare all necessary thing such as power supply, water supply, hydraulic oil, plastic material, plastic mold,
installation and commission period will be within 7days including training customer's employee.

6. How many workers are needed to operate this machine?
One worker only.

7. What is the power consumption for this machine?
Power consumption is determined by the product. Different product requests different power consumption.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA