Auotmatic Disposable Proofdust 2D Mask Welding Machine

Price $48000.00 Compare
Min Order 1 Set
Shipping From Guangdong, China
Popularity 274 people viewed
Quantity
+-
 

Dongguan Hengyao Ultrasonic Machinery Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
HY200-02A
1year
Nonvowen Folding Mask
Automatic
CE, ISO9001:2015
Customized
New
on-Line Service
Engineers Available to Service Machinery Overseas
Automatic Folding Mask Making Machine
Aluminium Alloy
38-45PCS/Min
Optional
Optional
HY
Packaged by Standard Export Wooden Box
7263*1391*1819mm
China
Product Description

Auotmatic disposable proofdust 2D mask welding machine

     1. PLC control.

     2. Photoelectric detection positioning.

     3. Add printing device.

     4. Tension control system.

     5. Good appearance and rustproof with aluminum alloy structure.

      It is a fully automatic production line to make foldable respiratory mask , which from
nose wire welding, earloop welding to finished mask. It can be with extra function of
ink-jet printer and pad printing system. It is available to reach the requirement of PM2.5
mask. It has a high automation  and stability with a high output and mostly reduce the
cost by completing products at one time.

Machine Size

7263*1391*1819mm

Output

38-45pcs/min

Voltage

220V/380V

Power

8.6kw

Special requirementDifferent size by changing mould





1)    Provide 24-hour service hotline.

2)    Reply and find out solution within the shortest time according to customer's requirement.

3)    Provide on call service to help customer solve problems.

4)    Provide free of machine installation as well as commissioning, and inform customer
       how to do the machine maintenance.

5)    Prepare customer's feedback tracking within one week after machine installation
       until meet customer's satisfaction.

6)    Provide one year guaranty and lifetime maintenance.


1.     Q: How is the after sales service?

      A: We provide 1 year guaranty and technical support lifetime. All machine's parts
            can be replaced for free within 1 year if broken(excluding error operation).

 

2.     Q: Is it difficult to install the machine?

        A: The work shop should prepare full facility such as power and air compressor.
             For the first installation, engineer will be sent to set machine and do the machine
             training as long as manual instruction. For the further problems come out, we
             can provide video instruction as well.

 

3.     Q: What's the machine lead time?

      A: For the standard machines, we can delivery within 30 days. If it is customized
            by customer(OEM), the lead time is 35-55 days.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA