Autoclaved Aerated Concrete Block Manufacturing Plant Low Cost for Sale Dongyue

Price $7000000.00 Compare
Min Order 1 Set
Shipping From Shandong, China
Popularity 479 people viewed
Quantity
+-
 

Dongyue Machinery Group Co., Ltd.

VIP   Audited Supplier 16 years
Profile Certified by SGS/BV
AAC block plant
Yes
1 Year
Concrete
Multi
Automatic
Computerized
CE, ISO9001/CE/SGS
Customized
New
Inner Wall, Villa, House
Hydraulic Pressure
Hollow Block Making Machine
280kw
3.5 -5 MPa
280 Kw
Have Cooperate with Ytong, Masa
50000, 100000, 150000, 300000cm/Year
Dongyue
Well Protected
customized
Shandong, China (Mainland)
Product Description

Product Description

Dongyue Machinery Group offers state-of-the-art AAC production line solutions tailored to your needs.

From concept to implementation, we provide everything for AAC production from a single source. Our services include development, construction, and installation of advanced machines, systems, and complete AAC plants. We support you at every step to ensure a customized AAC plant that meets your requirements.

Our unique technology and strong technical support deliver cost-effective, high-quality solutions. Whether you need a turn-key solution, equipment upgrades, or consulting, you can rely on us. Our team ensures the construction of an efficient, productive, and low-consumption AAC plant, leading to high returns for your business.

AAC production line process

1.AAC block raw material process and storage

To make a the rational design of the raw material storage areas, Dongyue  improve the material processing method to circumvent the dust noise, solid waste disposal and other problems for workers to create a comfortable working environment

2.weighing and pouring

The material, binder, gypsum and aluminum are respectively called by the corresponding automatic metering metering, high-speed mixer and then stirred within, into gas gun sort after pouring into the mold box. The entire system PLC automated control to ensure accurate and efficient operation of the process.

3.curing and cutting

Smooth static stop control will prevents the embryo to initiate the expansion process of the internal structure of the damage, Dongyue provide six-sided cutting programs, efficient and smooth cutting and turning device to Waste Paper is the core equipment.

4.Aerated and finished products process

 

After autoclave, brick obtain the final strength and performance. And the new technology  for the separate of the finished block can  packaging system will  not only improve the rate of qualified products, but also solve the problem of separate of the finished products .

Product Parameters

AAC brick and AAC panel production line capacity

TypeMould/Cutting machine sizeAnnual output (m3)
4.2m4.2x1.2x0.6m50,000~150,000
4.8m4.8x1.2x0.6m150,000~200,000
6.0m6.0x1.2x0.6m200,000~300,000
6.0m6.0x1.5x0.6m250,000~350,000
6.5m6.5x1.2x0.6m250,000~350,000
AAC brick Specification parameter
TypeTU groove brickFlat brick without groove
Length(mm)600600
Thickness(mm)75,100,125,150,200,250,30075,100,125,150,200,250,300
Height(mm)240,300,400240,300,400
 
Volume density levelB06B05B04
desiccated density(kg/m³)≤625≤525≤425
Strength levelA5.0A3.5A2.0
Drying shrinkage date
(mm/m)
0.50.40.4
freezing resistance
  1.  loss
%
≤5.0≤4.0≤3.0
Strength after freezing(Mpa)≥4.0≥2.8≥0.6
Dry coefficient of thermal conductivity
[W/(m·k)]
≤0.16≤0.14≤0.12

AAC panel Specification parameter
      TypeProduct size
Length(mm)Thickness(mm)Height(mm)
partition board≤300060075
≤4000100
≤5000125
≤6000150
≤6000175
Output 3000 m3 per day AAC block production line Main technical data:
ProductAAC block
Cake size6.0 x 1.2 x 0.6 M
Finished product size
 
(100, 150, 200, 250) x 200 x 600 mm
 
Density 500~650 Kg/m3 (controlled as per formula)
Autoclaving cycle10 h
Steam working pressure1.2 MPa
Working days300 days / year
Working shifts2.4 shifts / day
Working hours10 hours / shift
Power Supply3-phrase, 380V/50Hz
FuelCoal (caloric value: 5,600kcal/kg & or as customer's requirement))

Detailed Photos









AAC Block Advantages

AAC is one of the major achievements of the 20th century in the field of wall construction. It is a revolutionary material offering an unique combination of high durability and strength, low weight, unprecedented buildability and superior ecological green features.

 

 AAC is a high-quality,  non-load-bearing and extremely well insulating building material produced as standard or mega blocks or panels.

 

 

• AAC is a long proven material. It has successfully been used in world since early last century and is now among the mostly used wall building materials in Europe with rapidly growing market shares in Asia, the Middle East and recently America.

FAQ

1.1Payment Terms
Total contract price will be paid by the buyer to seller the as per the followings:
-30% of total contract price will be paid by T/T as down payment.
-70% of total contract price will be paid by T/T or an irrevocable L/C at sight against shipping documents.
Or other terms to be agreed upon.


1.2Delivery Terms
All machines will be ready for delivery in seller's workshop within 180 days after the contract come into force.

1.3Packing
To be packed suitable for long distance ocean transportation and well protected against damage, moisture, shock, rust and handling.
The equipment will be kept in covered and guarded areas when it arrives at the Buyer's plant. All the precautionary measures necessary for the correct protection of the materials will be taken while awaiting its installation.

1.4Warranty
The Seller shall guarantee that all the contract equipment are completely brand-new and conform to the technical specifications. The mechanical guarantee on machinery and equipment shall be 12 months from the acceptance date, or 18 months from the date of first delivery of the goods in case the commissioning cannot be carried out due to the Buyer's reasons. During the warranty period, if the accessories or equipment are damaged, due to the Buyer's insufficient maintenance or improper operation of the equipment, the Seller will replace or repair it at Buyer's charge. If the said damages are due to faults in design, poor quality or workmanship, the Seller will replace or repair it at his own cost.

1.5Installation
Includes the following phases:
-Positioning of the equipment in conformity with the plant layout,
-Possible guide of unpacking,
-Guide Assembling of what is necessary for the completion,
-Guide Connection with various electrical, pneumatic, or other supply sources,
-Guide Adjustment of the equipment; leveling; running of motors,
-Seller will arrange following engineer do the install service:
Mechanical Engineer
Electrical Engineer
Boiler Engineer
Ball Mill Machine Engineer


1.6Start-Up
This includes all actions necessary to put the contract equipment in operation until the completion of the production acceptance standards.
Upon what above-mentioned processing finish, the Acceptance Certificate of the Plant shall be issued.


1.7Training
Buyer's personnel shall be trained at an AAC factory in seller's country and, further trained at buyer's contract plant. The fee for training could be negotiable between seller and buyer.

1.8Others
a.All taxes and duties including government charge on services, import duty, income tax, and so on, incurred in the Buyer's country during the implementation of the contract shall be borne by the Buyer.
b.The offer price includes the charge for supervision of installation and start-up. But the international round tickets, lodging and local transportation for the seller's technicians shall be at buyer's account.
1.9Validity of Quotation
15 days from the date of quotation.
 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA