
Filling Capacity | 2400box/hr |
Filling Range | 125ml |
Packaging Shape | Slim Shaped, Standard Shaped |
Shelf Life | in 25-30ºc , juice shelf life 6-12months , milk 6 months |
Packaging Material | PET/PAPER/PE/AL/PE/PE |
Voltage | 220V/380V 50Hz |
Power | 35kw |
Air Consumption | Air pressure: ≥0.6 Mpa |
Weight | 1750kg |
Size | 3050*2450*3500mm |
1) The machine is suitable for filling milk, juice, soymilk etc other beverage.
2) The machine Automatic Form Feed -sterilize -filling -shaping - sealing
3) PLC human control, Human - Machine Interface with English and Chinese display. Intuitive operation and Low Fault rate.
4) Automatic finished all the job step, which includes run over the scroll reposefully, batch number, stick plastic tape, chemical and physical sterilizing, roll into cylinder, filling material, sealing-off, molding, cutting and horn-shaped.
5) The forming system we choose our own patent rectangular forming method instead of roundness system. this system made the running much more stable, the function much more reliable, the exterior appearance of the product much perfect.
MANUFACTURE AND MODEL
1) PLC: Japan mitsubishi
2) Touch Screen: Japan mitsubishi
3) Motor: Domestic
4) Temperature control: Real da
5) Inverter: Japan mitsubishi
6) Power:380V;50Hz
7) Low-voltage electrical apparatus: Omron
8) Pneumatic components: Air TAC
9) Proximity switch: Japan & omron
10) Photoelectric: Japan



Size | 3010*2490*3450mm |
weight | 1770KG |
packing details | Automatic Diamond PackaginAutomatic Aspetic Carton Filling And Sealing Machg Aseptic 200ml Carton Juice Filling Machine For Milk is wooden box(Size: L*W*H). If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request. |
Shean Factory is specialized in research and production of beverage machinery equipment, Approved by the national certification for manufacturing measuring instruments. Our filling machine adopts milk, juice, dairy drink, beverage etc liquid or semi liquid products. Our machines pass CE and ISO certificate, and some get our own natonal patent, sells home and abroad.



1. Can you guarantee your quality if we order on you ?
Of course.Best quality is our principle all the time.You can be assured on our production.
2.What should I do if we are not able to operatethe the machine when we receive it?
Operation manual guides you the installation.Besides, we haveprofessional after-sale groupto customer 's site to solve any problems.weprovide 7*24 hours on-line technical support.
3.How could I get the spares on machines?
We will send extra sets of easy broken spares andaccessories likeo ring etc.Non-artificial damagedspares will be sent freelyduring 1 year 's warranty.
4.How to maintain such a machine ?
Please clean every part after filling thus can givelong using life of machine and make a carefullyclean 3 times a year.
5.Anstrallation and Commissioning
INSTALLATION and COMISSIONING Two weeks before the equipment is shipped, the seller and the buyer will communicate on the equipment entry conditions, required installation and commissioning cooperation and other matters, and assist the buyer in preparing the project site. The buyer shall prepare the water source, power source and steam source required for equipment commissioning and operation to connect to the seller's equipment according to the seller's requirements. After the equipment arrives at the user's workshop, the goods will be unpacked in the presence of personnel from both parties. The seller's personnel shall carry out the installation, commissioning and trial production of the equipment with the assistance of the buyer's personnel, and achieve the design capability within the planned time. The seller is responsible for the tools and spare parts needed for installation and commissioning (except for inconvenient transportation, such as argon gas).
6. Staff Training
Our company should dispatch enough skilled technicians to put the machine into use within the necessary time and train customer personnel. The technical staff's air tickets, board and lodging fees and any car rental costs will be borne by the buyer
7.Guarantee
The above products are guaranteed not to be affected by possible defects in materials and/or workmanship within 12 months from the date of installation. If the buyer issues a written notice in a timely manner within 15 days after the defect is discovered, and within the above-mentioned maximum period of 12 months, the seller will repair and/or replace the defective part at its own expense.
8.After Sales Service
After the installation and training plan is completed, if the buyer submits a written application to the seller, the seller will intervene and provide services to the machinery and/or equipment provided. Every time a service is requested, the buyer's technical staff's travel expenses (round trip), board and lodging, and any rental car expenses must be paid, as well as a daily fee of US$150 per technician.