Automatic Argon Gas Filling Insulating Glass Production Line with 7 Sections

Price $50000.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 317 people viewed
Quantity
+-
 

Shandong Eworld Machine Co., Ltd.

VIP   Audited Supplier 8 years
Profile Certified by SGS/BV
LBZ2500A
CE
PLC
Customized
3-19 mm
45m/Min
0-8m/Min
3-25mm
30-40seconds
One Year
Insulating Glass Production Line
Vertical
Ultrasonic Glass Washing Machine
Glass Straight Edging Machine
New
1 Year
Eworld
Seaworthy Package Wooden Case
2500*3500mm
China
84752919
Product Description


CNC aluminum bar bending machine: CNC contrlled. Fully automatic
Automatic aluminum bar bending machine: Automatic. needs worker to control
Automatic desiccant sieve filling machine: Automatically pours the desiccant to aluminum bar.
Butyl extruder: applys the butyl rubber on the aluminum bar for the first time to initially fx the two pieces of glass
Two component silicone hot melt extruder: Applys second silicone glue to the glass
Hot melt extruder: Applys second silicone glue to the glass
Automatic glass sealing robot: Applys second silicone glue to the glass automatically
Aluminum bar cutting saw: this machine automatically cuts the aluminum bar.
Gas filling machines: argon gasfilled to glass interspace
Space moving machine: Automatically moves aluminum bar.
Rotating table: this machine rotates the glassBelt edging machine: roughly grinds the edge of glass
Belt edging machine: roughly grinds the edge of glass
FAQ

1.Question:Are you manufacture?

Answer:

Yes,we are the professional manufacture which have more than 5 workshops.

2.Question: How about the service ?
Answer:
1).reply it at once if from Ali-trademanager,if by email,it reply it within 12 hour
2).deliver max. days within 15 days
3).24 hours for after -sale serive
4).more than 12 years experience in this kind machine field
5).fluent english ,communication barrier free

3.Question:What's the guarantee ?
Answer:
1).Our guarantee for 18 months.
2).24 hour's technical support by email or calling
3).English manual and video tutorial
4).2 year quality guaranty for the machine (excluding the consumables)
5).We will provide the consumable parts at an agency price
6).24 hours on line service each day, free technical support.

4. Q: Do you provide equipment operation training?

Answer:
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passport.

5.Question:if our price is higher than another company or factories ?
Answer:
please check, what is is the different of the machine parts ,service and guarantee,especially the machine inner electric parts, sometimes, if machines have breakdown, the most reason is the machine inner electric parts problem, but we use the famous and reliable parts for the machines inside.

6.Question:How long is the delivery time ?
Answer:
For standard machines, it would be 3-15 days; For non-standard machines and customized machines according to clients specific requirements, it would be 15 to 30 days.

7.Question: What is the payment ?
Answer:
Any payment method you want,such as L/C,T/T,D/P,West-union and so on

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA