GBCE-1200II
1 Year
PE Film Blowing Machine
PE
1000mm
55mm
Automatic
Computerized
4T
CE, ISO9001:2008, TUV
Made in Taiwan
Automatic Change Roll
PLC
28:1
LDPE0.015-0.20mm HDPE0.008-0.05mm
Delta
Schineder
One Year
Corona
Auto Loader
SILSTAR
Wrapping Film Packing or Packed in Wooden Case
3900KG
Jiangyin City, Jiangsu Province, China
84773090
Product Description
It is used for blowing the plastic laminated film of low density polyethylene (LDPE), high density polythylene(HDPE)and linear low density polyethylene(LLDPE)etc, Which are widely used for packing liquid, printed base material, products for export and industrial products, etc.
Description
1. Double-layer co-extrusion laminated film can prolong the length for preservation of liquid package.
2. The cylinder and the screw stem of the extruder are made of high-quality alloy steel with optimum hardness and durable service after precision finishing and nitrogen treatment.
3. The auxiliary machine has a platform working table for making operation easy and is equipped with a bubble stabilizing ring.
4. Double-rolling and double-cutting coiling units adopt torque motor to keep proper tensions and make rolling even and roll-changing easy.
Description
1. Double-layer co-extrusion laminated film can prolong the length for preservation of liquid package.
2. The cylinder and the screw stem of the extruder are made of high-quality alloy steel with optimum hardness and durable service after precision finishing and nitrogen treatment.
3. The auxiliary machine has a platform working table for making operation easy and is equipped with a bubble stabilizing ring.
4. Double-rolling and double-cutting coiling units adopt torque motor to keep proper tensions and make rolling even and roll-changing easy.

Model | GBCA-600II | GBCE-1000II | GBCE-1200II | GBCE-1600II |
Screw diameter | 45mm | 55mm | 65mm | 80mm |
Screw length proportion(L/D) | 30:1 | 30:1 | 30:1 | 30:1 |
Film-blowing width | 100-600mm | 300-1000mm | 300-1200mm | 300-1600mm |
Film-blowing thickness | LDPE0.015-0.20mm HDPE0.008-0.05mm | |||
Output | 10-60kg/hour | 30-100kg/hour | 30-120kg/hour | 50-150kg/hour |
Main motor power | 11kw | 22kw | 37kw | 45kw |
Dimension of the machine | 5000×1500×4000mm | 5400×2800×4800mm | 5400×3000×6800mm | 6200×3400×7500mm |
Total weight | 3000kg | 3800kg | 4200kg | 4800kg |






Other machine you may interested:
1.Film blowing machine
2.Coreless Bag making machine
3.Bag with Core making machine
4.Recycle machine

Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.
SILSTAR workshop pictures:



1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |