Automatic HDPE LDPE Poly Nylon T-Shirt Vest Bag Shopping Flat Grocery Bag Plastic Garbage Bag Making Machine Biodegradable

Price $50000.00 Compare
Min Order 1 Piece
Shipping From Zhejiang, China
Popularity 253 people viewed
Quantity
+-
 

Wenzhou High Sea Machinery Co., Ltd.

VIP   Audited Supplier 18 years
Profile Certified by SGS/BV
HSWZ-900
Engineer Will Comes to Install Machine
12 Monthd
1
1
380V
Heating Sealing
High
Yes
Heat-Sealing Cold-Cutting
8 Layers
Bag Forming Machine
Computerized
Plastic Bag Making Machine
Hswz-700
1 Line
600-860mm
150-220mm
600-860mm (Bag Open Size)
200-1500 mm
7-35 Micron Per Layer
2 Layers for Sealing and 8 Layers for Rewinding
80-100 M/Min
120mm (Max.)
16kw
5HP
3200kg
High Sea
Wooden Pallet
L7000*W2500*H2000mm
Made in China
84778
Product Description
Fully Automatic Two Times V-fold Bottom Sealing Bag-on-roll Making Machine
HSWZ-900 
Fully Automatic Two Times V-fold Bottom Sealing Bag-on-roll Making Machine




 
Application
This machine is heat sealing and teeth cutting for bag peforation, which are suit for printing and non-printing bag making. The material of bag is LDPE, HDPE and recycle materials.

HSWZ-900 machine is bottom sealing perforation bag machine. Machine design for sealing first, then fold and perforate in the last. Double times V-folds will make film smaller and bottom sealing. Tear out one pcs of rewinder bags, it can be opened and insert into the large trash can.

This machine is sealing first, then folding and perforation in the last. Bottom sealing bag on roll coreless.

 
 
TECHNICAL PARAMETER
ModelHSWZ-900
Film Width600mm-860mm
Bag Width150mm - 220 mm (customized)
Bag Length200mm - 1500 mm
Film thickness10-35µm per layer
Production Speed80-200pcs/min*1 Line
Set Line Speed80-100m/min
Film Unwind DiameterMax. Φ900mm
Total Power13KW
Air consumption5HP
Machine Weight3200KG
Machine DimensionL7000*W2500*H2400mm
 
Samples of Plastic Bag




 
SPECIFICS








 
Cooperation Brand
The condition of machine operating
A. illumination no exceed 3000LX
B. altitude no exceed 1000m
C. The temperature of stuff around the machine should be no higher than
+40ºC and no lower than -20ºC.
D. The relative humidity of air no exceeds 85%.
E. The place should no have conductive dust.
F. Circumstance of no blast danger and fire.


 
Company Brief Introduction
Wenzhou High Sea Machinery CO.,LTD is founded in 1996 (Formerly known as Jinfeng plastic packaging machinery factory). For more than 22 years, we focus on researching, developing, manufacturing and marketing on plastic bag making machine. Our  products include :

1.Plastic T-shirt Bag Making Machine
2.Vegetable Bag on Roll Making Machine With Core
3.Garbage Bag Making Machine Coreless
4.Draw Tape Garbage Bag on Roll Making Machine
5.Soft Loop Handle Bag Making Machine

There are more than 54 countries and regions cooperating with us, such as south Korea,
Turkey, Malaysia, Russia,Iran, Ethiopia, Chile, Saudi Arabia, Peru, Algeria
,Vietnam,etc.
 
Work Shop



 
Exhibition 




 
Other Products

FAQ
1.Q: How long will your engineer reach our factory?

  A: Within 7-15 days after machine arrival your factory.
2. Q: How many days will you finish installing ?

   A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

   A: You should charge for the cost of our engineer's visa , round trip tickets, accommandation, and also their salary 100USD one day per person.
4. Q: How long is your machine's warranty period?

    A: All our machine have one year guarantee, starting from finished installation.
5. Q: How could we do after one year warranty period?

   A: We also can do service for you, but you need pay salary for my technician 100USD/day.
6. Q: How could we do if the parts broken within warranty?

   A:We would express the free replacement parts during the warranty date.
 7. Q: Does your engineer understand English?

   A:Our engineer understand a little English. All of our engineers have more than five years machine installation experience. 
8. Q: How many worker do we need running those machines?

     A: Usually need one person to opertate the machine.
9. Q: How do we solve the machine problem after your engineer leaving?

    A: Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according your description.
10. Q: How can I visit your company?
   
    A : It takes 50 minutes by car from Wenzhou Air Port to our factory .
        And it takes only 10 minutes by car from Ruian train station to High Sea factory .
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA