BOPP Slitting Machine Non-Stop Fr-210n

Price $30000.00 Compare
Min Order 1 Piece
Shipping From Anhui, China
Popularity 418 people viewed
Quantity
+-
 

Anhui Furi Intelligent Equipment Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
FR-210N
After-Sales Service Supported
1 Year
Machinery&Hardware
High-Speed Slitting Machine
Razor Blade and/or Air Blade
Frame Part
Case
Tape Slitting Machine
Process Materials
Film & Masking Tape
Wood
Rewind Without Shutdown
BOPP Fast Slitting/Converting
Max. 180mm
Max. 800mm
3"
Razor Blade
FURIMACH
Container
12.5T
Anhui, China
Product Description
FR-210N Slitting Machine 1.3M/1.6M (BSP-S)

Application: suitable for slitting BOPP tape.
Effective cutting width: 1300mm/1600mm. Other width and materials to be designed after communication.
Features: Four-shaft exchange type. Unloading the outer shafts, while the inner two shafts still rewind tapes. Higher efficiency with competitive price.
 
>  EFFECTIVE WIDTH  1320mm/1620mm
>  SLITTING WIDTH 12MM~1300MM/12MM~1600MM
>  ACCURACY  +/-0.1mm
>  REWIND CORE I.D.φ76.2±0.2MM
>  CORE TYPEPAPER CORE
>  UNWIND CORE I.D.φ76.2±0.2MM
>  CORE TYPEPAPER CORE
>  UNWIND DIAMETER MAX.800mm
>  REWIND DIAMETER MAX.180mm (FOUR-SHAFT EXCHANGE)
>  MACHINERY SPEEDMAX.180M/MIN
>  POWER SOURCE  380V  50HZ  3PHASE
>  AIR SOURCE 5 KG (PREPARED BY USER) 

Safety instructions

Safety rules
1. Please read the operation manual before operating the machine.
2. The operator should not wear long hair or gloves, and should fasten the cuff.
3. Don't clean the machine in operation.
4. When the machine powers on, don't open the electronic control door or touch the electric components to avoid being hurt.
5. When machine is running, please keep a distance, don't touch the slitting blade.
6. Except for slitting rewinding, don't load materials on the rewind shafts.
7. Don't touch the rewinding shafts in when machine is running.
8. Don't open the control box or touch the driving part when visually measure the machine operation.
9. Don't put any tool on the machine.
10. Power off the machine before fixing it.
11. Before opening the electric box, switch off the power.
12. Don't tear the machine except professional technicians.
13. Please maintain the machine regularly.

Maintenance Instructions
1. Keep machine clean and control box ventilated.
2. Air pressure three point combined valve open once per day to drain the oil water, and open four hours in moist atmosphere.

3. Three points lubrication oil and oil injector and check every day to ensure the smooth running of the machine.
4. Clean the machine surface and control box inside every day, and air shaft dust and oil dust (three times per week).
5. Add oil once per week.
6. Every month check the screws and driving part if loose or not.
7. Air pressure three points combined method.
8. Adjust the air pressure between 4~6kg/cm2(70 1b/in2~90 1b/in2)
9. Dispose the water and just need to move up.
10. 
Check the oil cup if the oil is enough or not, if not, add oil M22, M12 or NO> 10 oil cup.
11. Lubrication oil adjust F method to chuck ON-OFF 5 times and drip one drop of oil, clockwise the with much oil and counter clockwise with little oil.
12. 
A: Air pressure set button (up: pressure high on the right turn and vice versa)

      B: pressure meter
      C: air pressure source(quick connection head)
      D: oil filter
      E: water driller
      F: lubrication oil adjustment
      G: oil cup

Pictures
 
 


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA