Support
Without Logo Printing
Bt-Sln
Customized
Tool Holder
42CrMo
ISO 9001:2008, CE, SGS
Side Lock End Mill Holder
Bt30/40/50
0.003mm
HRC50-52
Customized Color
Longer Working Life
Standard Package
RZ
Standard Packaging
China
Product Description
Side Lock End Mill Holder
1. High concentricity, good processing effect, more stable performance to improve processing efficiency and extend tool life.
2. The raw material is 20CrMnTi, which has stable performance, long service life and improved hardness of the toolholder.
3. The toolholder adopts double-sided restraint design, which is closely fitted to both sides of the spindle to reduce the tool system imbalance and thus reduce vibration, and effectively enhance the steel of the toolholder.
Size | d | D | L |
BT40-SLB06-50 | 6 | 25 | 50 |
BT40-SLB08-50 | 8 | 28 | 50 |
BT40-SLB10-63 | 10 | 35 | 63 |
BT40-SLB12-63 | 12 | 42 | 63 |
BT40-SLB14-63 | 14 | 44 | 63 |
BT40-SLB16-63 | 16 | 48 | 63 |
BT40-SLB20-63 | 20 | 52 | 63 |
BT40-SLB25-90 | 25 | 65 | 90 |
BT40-SLB32-100 | 32 | 72 | 100 |
BT40-SLB40-120 | 40 | 80 | 120 |
BT50-SLB06-63 | 6 | 25 | 63 |
BT50-SLB08-63 | 8 | 28 | 63 |
BT50-SLB12-80 | 12 | 42 | 80 |
BT50-SLB14-80 | 14 | 44 | 80 |
BT50-SLB18-80 | 18 | 50 | 80 |
BT50-SLB20-80 | 20 | 52 | 80 |
BT50-SLB25-100 | 25 | 65 | 100 |
BT50-SLB32-105 | 32 | 72 | 105 |
BT50-SLB40-110 | 40 | 80 | 110 |
2. Double firmness, strong clamping force The handle is fastened with double screws on the side, the clamping force is stronger, and the processing is safer and more stable
3. Strong and powerful, thickened inner wall, easy clamping Compared with the previous generation of handles, the inner wall is thicker, the rigidity is stronger, and the service life of the handle is greatly increased

for Grinding Technology

Our customers are in woodworking metal processing, automotive stone glass gemstone industrial ceramics,Oil and gas drilling and construction industries. Our products have performed well in these industries for a long time Long service life, high efficiency and low unit cost.

PACKAGE:
SINGLE BOX PER WHEEL,
10 to 20 WHEELS PER CARTON
DELIVERY TIME:
3-30 days after confirming order,detail delivery date should be decided according to
production season and order quantity.