Building Galvanizd Scaffold Heavy Light Duty Telescopic Post Adjustable Formwork Construction Scaffolding Support/Shoring Steel Prop

Price $30.00 Compare
Min Order 750 Pieces
Shipping From Shandong, China
Popularity 442 people viewed
Quantity
+-
 

Shandong Shlomi Machinery Co., Ltd.

VIP   Audited Supplier 8 years
Profile Certified by SGS/BV
SLM
Q345
Fixed
Multi-Pole Scaffolding
Floor Type Scaffolding
Full Scaffolding
Internal Scaffolding
Scaffolding Props
Building Scaffold
En1065
Construction & Decoration
DIP Painted/Powder Coated/Hot-DIP Galvanized
Red/Silver/Blue/Grey
SGS,ISO9001:2015
Shoring for Slab Formwrk or Scaffoldi
Customized Manufucturing According to Die
SHLOM
by Steel Pallet or Strap in Bundle
China
730840000
Product Description
 
PRODUCT DESCRIPTION
 
 
Heavy Duty Steel Props, as the most popolar prop serie among all telescopic props, is designed and manufactured according to EN1065. The sizes are available from 1500mm to 5000mm with working bearing load limits from 20kN to 30kN. 

  Feature
 * Convenient erection with its nut and handle
* 20kN(D class) & 30kN(E class) at different open lengths for your selection
* Anti-dislocation of inner tubes flying out of outer tube
* 100mm safe zone design on the top of inner tube avoiding any injury on the hands of users
* Hot dip galvanization treatment prevent the prop from corrosion, other treatment are also available
* According to EN 1065 standard
 

ITEM NO.Closed Length(mm)Open Length(mm)Reference Weight(kg)Work Bearing Capacity
SLMP-D251450250015.120kN
SLMP-D301800300017.120kN
SLMP-D352000350018.920kN
SLMP-D402200400022.220kN
SLMP-D502820500035.220kN

 
SLMP-E301800300020.030kN
SLMP-E35 2000350024.330kN
SLMP-E402200400026.830kN



 

PRODUCTION

     We use high quality steel pipe, after cutting, punching, welding, quality inspection, galvanizing or painting,Final Assembly completed. For shoring purpose, in various kind of slab projects ,it is very popular in the Middle East and Europe.


 

TESTING

Every product we have to go through strict testing and testing to ensure that each product is qualified.Including raw material,size,power ect.
 











PACKING&DELIVERY

1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.




HOT PRODUCTS




 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA