C160
Global Service
18 Months After Shipment Date
200-3000kw
Alternator
AC Three Phase
CCC, ISO, CE
Standard
Pulse Type
Synchronous
Asynchronous
50Hz
60Hz
380/430
Waste Heat
Waste Heat Recovery Boiler
Energy Saving
CHENYANG
Sea Worht
200-3000KW
China
8406811000
Product Description
ADVANTAGES OF SMALL SCALE PRESSURE DIFFERENCE COGENERATION SET
- High flexibility,
- Low investment and quick back,
- Effectively solving the industrial waste heat, differential pressure utilisation,
- Reducing costs and increasing efficiency for enterprises, and meeting customer needs.
- High flexibility,
- Low investment and quick back,
- Effectively solving the industrial waste heat, differential pressure utilisation,
- Reducing costs and increasing efficiency for enterprises, and meeting customer needs.
C160 SERIES SINGLE STAGE BACK PRESSURE STEAM TURBINE
CHARACTERISTICS
- One Curtis wheels 1600mm.
- Electronic governor for speed control.
- Or mechanical governor TG17 or TG13 of Woodward
- Main shaft speed 1000~1500r/min, gear box optional.
- Can run at low speed and ensure the turbine efficiency, and can be connected directly to driven load.
- Small volume and less space needed.
- Better safety and reliability.
TECHNICAL SPECIFICATIONS
Model | Rated power (kW) | Speed (r/min) | Intake pressure (MPa) | Intake temperature (ºC) | Exhaust pressure (MPa) | Steam consumption (t/h) |
B0.3-0.3/0.15 | 300 | 1480 | 0.3 | 200 | 0.15 | 46.8 |
B0.5-0.98/0.15 | 500 | 1480 | 0.98 | 300 | 0.15 | 21.16 |
B0.63-0.5/0.2 | 630 | 1480 | 0.5 | 260 | 0.2 | 32.36 |
B1.5-0.9/0.2 | 1500 | 1480 | 0.9 | 270 | 0.2 | 24.2 |
B1.6-0.98/0.2 | 1600 | 1480 | 0.98 | 300 | 0.2 | 21.58 |
B0.45-1.6/0.2 | 450 | 1480 | 1.6 | 300 | 0.2 | 20.4 |
B1.8-1.7/0.4 | 1800 | 1480 | 1.7 | 280 | 0.4 | 21.9 |
B1.1-1.08/0.2 | 1100 | 1480 | 1.08 | 264 | 0.2 | 20.4 |
B1.6-0.98/0.2 | 1600 | 1000 | 0.98 | 260 | 0.2 | 27.2 |
B0.8-0.9/0.5 | 800 | 1480 | 0.9 | 300 | 0.5 | 38.8 |
- The intake and exhaust pressure is absolute pressure.
- Steam turbine weight 8.5 tons.
SUCCESSFUL PROJECTS PRESENTATION
USER: ALUMINIUM FACTORY COGENERATION PROJECT
MODEL: B1.64-0.98/0.4
POWER: 1640KW
INTAKE PRESSURE: 0.98MPa FROM HEAT RESOURCE
EXHAUST PRESSURE: 0.4MPa FOR PRODUCTION
GENERATOR: SYNCHRONOUS GENERATOR





