JT-W50
24hours
1year Warranty
Water-Cooled
Screw
Integral
380V/50HZ
1
Low
Plastic
CNC Machine Tools
CE
New
Wooden Case Pickage
40-580hp
China
Product Description
CE Certification Water Cooling System Industrial Screw Cooled Water Chiller
Water Chiller Advantage(1) . The chiller is adopt water to make it's own condenser cooling, so the chiller condenser will connect with a cooling
tower when working, it's advantage is high cooling efficient , lower electric power consumption than air cooling, and
more suitable for high ambient temperature working condition and large cooling capacity project.
(2) Adopt 2 compressor circuits system, each one with own system can work alone, if one of then with problem, user
can no need to stop production only running one compressor to keep work.
(3) Installation for the system reference:


Model | Unit | JT-50W | JT-60W | JT-80W |
Refrigerating Capacity | KW | 152 | 172 | 230 |
Kcal/h | 130720 | 147920 | 197800 | |
Input Power | KW | 37 | 45 | 60 |
Control Type | Expansion Valve | |||
Refrigerant | R22(R407C) | |||
Compressor | Type | Semi-hermetic Screw | ||
Quantity | 1/2/4 | |||
Startup Mode | Y-△start | |||
Capacity Control (%) | 0-25-50-75-100 | |||
Power | 3PH-380V/50HZ(200V/220V/415V 50HZ/60HZ) | |||
Evaporator | Type | Shell and Tube Type | ||
Cooling Water Flow(m3/h) | 26 | 30 | 39 | |
Water Pipe Diameter(inch) | 3'' | 3'' | 4'' | |
Condenser | Type | Shell and Tube | ||
Cooling Water Flow(m3/h) | 33 | 40 | 45 | |
Water Pipe Diameter(inch) | 3'' | 4'' | 4'' | |
Safety Protection | High and Low Pressure Protection, Overload Protection,Overtemperature Protection, Phase Sequence Protection,etc. | |||
Dinmensions (L*W*H) | mm | 2340*800*1670 | 2580*800*1720 | 3130*900*1860 |








FAQ
1. Are you a manufacturer?
A: Yes
2. How about your warranty?
A: 1.All of our products for one year warranty.
2.24-hour telephone service.
3.A large stock of components and parts, easily worn parts.
4.Toolkit will attach with Machine
3. Can robot be put on cilent's logo?
A: Yes
4. How can you guarantee we receive a good performance product?
A: Every machine will be tested before shipping.Jietou applied series inspection process during production
When the machine was finished. QC will provide inspection video and pictures for double check the quality control,
and we will send the troubleshoot and solutions if needed.also third part or customers come to the factory have field inspection is welcome.
5. Who do I talk to when I want to start an application?
A: Jietou has experiences of sales engineers to provide the assistance and support you require.
6. How soon can you deliver the equipment?
A:1-7 days(stock available), Customized equipment or no inventory machine normally need 15-25 days.
7. What is your payment term?
A:The payment method is TT,50% prepayment,50% balance before cargo delivery.
8. How to buy your machine?
A: advise specification → confirm model&price→ sign a PI →pay the deposit,
→machine manufacture→pay the balance→ ship out and provide the tracking number.