DRYC-DG-001
24 Hours Around Clock
CE, ISO, UL
Customized
Modern
Steel Structure
Plastic Steel Window, Alluminum Alloy Window
Swing, Sliding or Rooler Door
Painted or Galvanized
Red, White, Blue, Green, Grey
Wind Load, Snow Load, Earthquake
>50 Years
Column, Beam, Purlin, Bracing
Design, Fabrication, After-Service
Hot-Rolled Steel
Steel Column
H-Section Steel
Steel Structure Hotel/Apartment
Q235/Q355
DINGRUIYONGCHENG, Carbon Structural Steel
Seaworthy Package for Steel Structure as Request
Customized
Qingdao, China
7308900000
Product Description
Features:
Our hotel building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy, beautiful appearance, short construction time, good effect of insulation, long using life, space-efficient, good seismic performance
Material List | |
Project | Steel Structure Hotel Building |
Size | According to Customer Need |
Main Steel Structure Frame | |
Column | Q235B, Q355B Welded H Section Steel |
Beam | Q235B, Q355B Welded H Section Steel |
Secondary Steel Structure Frame | |
Purlin | Q235B C and Z Type Steel |
Knee Brace | Q235B C and Z Type Steel |
Tie Tube | Q235B Circular Steel Pipe |
Brace | Q235B Round Bar |
Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe |
Roof and Wall Systerm | |
Roof Clading | Steel Sheet or Sandwich Panel (EPS, PU, Glass Wool, Rock Wool) |
Wall Clading | Steel Sheet or Sandwich Panel (EPS, PU, Glass Wool, Rock Wool) |
Door | Sandwich Panel Sliding Door/Rolling Metal Door |
Window | Aluminium Alloy Window/PVC Panel Window |





The plasticity of the hotel provides a wide space for the exterior design, which can easily achieve a variety of complex and unique shapes. It can also be customized according to the location of the hotel and the surrounding environment
The components of the steel structure hotel are mostly prefabricated in the factory, and the on-site construction is mainly assembled, which greatly shortens the construction cycle, while the durability and recyclability of the steel reduce long-term operating costs and environmental impact.


Steel has high strength and good toughness, which makes the steel structure hotel more stable and reliable in structure. It can effectively withstand the impact of natural disasters such as earthquakes and strong winds, and provide guests with a safe living environment.




2. Dingrui Yongcheng has domestically advanced intelligent fully automatic new building materials processing and production lines, which can independently complete a series of processes such as steel plate cutting, transmission, assembly, flipping, welding, and correction, truly realizing the fully automatic process of industrialized production and mechanized operations.
3. In the future, Dingrui Yongcheng will continue to adhere to the principle of "quality first"provide customers with high-quality one-stop solutions with a pioneering and enterprising corporate style, and a pragmatic and efficient corporate spirit.


A: We are an integrated industry and trade company. You are welcomed to visiting our factory. The quality control flow and sales team will show you our professionalism.
Q: Whats the quality assurance you provided and how do you control quality?
A: There is a procedure to check products at all stages of the manufacturing process -raw materials, in process materials, validated or tested materials,finished goods, etc. SGS, BV and other testing are available for us.
Q: Can you offer designing service?
A: Yes, we have more than 20 experienced designers. We could design full solution drawings as per your requirements. By using Auto CAD, PKPM, MTS3D3S,Tekla Structures (X steel) etc, we can design complex industrial building like office mansion, super market, plants, shipping mall, 5 stars hotel,etc.One-stop service is our outstanding superiority
Q: How about the delivery time?
A: The specific production time depends on the quantity of goods. Normally, it is about 10 to 30 days after all the details are confirmed and receiving the deposit. The delivery of Large order should be discussed with the management department in advance and then confirm the timing with you accordingly.Usually, large order will be delivered in batches.
Q: What about the installation instrucions?
A: We will provide you installation videos and detailed installation instructions or online technical guidance.If you need, we can provide the service of installation guidance arrange a team to do the installation on site by extra.
Q: How about the payment?
A: All payment methods are acceptable. We prefer to 30% down payment by T/T,70% balance before shipment.
