




BASIC TECHNICAL PARAMETERS | |||||
Model | CPCD-50 | CPCD-60 | CPCD-70 | ||
Power Type | Desiel | Desiel | Desiel | ||
Rater Loader | (kg) | 5000 | 6000 | 7000 | |
Load Centre Distance | (mm) | 600 | 600 | 600 | |
Battery (voltage/capacity) | (V/Ah) | 24/100 | 24/100 | 24/100 | |
PERFORMANCE PARAMETERS | |||||
Max Lifting Height | H | (mm) | 3000 | 3000 | 3000 |
Free Lift Height | H5 | (mm) | 190 | 190 | 195 |
Gantry Angle (front/rear) | a/β | (°) | 6/12 | 6/12 | 6/12 |
Max Lifting Speed (full load/no load)) | (mm/s) | 540/570 | 540/570 | 540/570 | |
Max descent speed (full load/no load) | (mm/s) | 450/360 | 450/360 | 450/360 | |
Max travel speed (full load/no load) | (km/h) | 25/30 | 25/30 | 25/30 | |
Min turning radius | r | (mm) | 3320 | 3320 | 3400 |
Gradient (full load/no load) | (%) | 20/25 | 20/25 | 20/25 | |
Max hook traction | (KN) | 70 | 70 | 70 | |
Over Weight | (kg) | 8330 | 8800 | 9550 | |
DIMENSIONS | |||||
Length (without fork) | (mm) | 3480 | 3480 | 3580 | |
Width | W | (mm) | 2000 | 2000 | 2000 |
Mast hight | H1 | (mm) | 2500 | 2500 | 2500 |
Top guard height | H3 | (mm) | 2450 | 2450 | 2450 |
Shelf height | H6 | (mm) | 1440 | 1440 | 1440 |
Total Height at Max Lift | H2 | (mm) | 4430 | 4430 | 4430 |
Min Ground Gap | (mm) | 200 | 200 | 200 | |
wheel base | L | (mm) | 2250 | 2250 | 2250 |
Front Wheel Tread | W1 | (mm) | 1470 | 1470 | 1470 |
Track | W2 | (mm) | 1710 | 1710 | 1710 |
Front Overhang | L2 | (mm) | 590 | 590 | 590 |
Rear Overhang | L3 | (mm) | 640 | 640 | 740 |
OTHER PARAMETERS | |||||
Tire | 8.25-15-14PR | 8.25-15-14PR | 8.25-15-14PR | ||
Fork (length * width * thickness) | b | (mm) | 1220×150×60 | 1220×150×60 | 1220×150×65 |
ENGINES | |||||
Engine Model | YUCHAI YCA05115-T480 | ||||
Rated Power | (kw/rpm) | 85/2200 | |||
Maximum Torque | (N.m/rpm) | 500/1400-1600 | |||
Number of Cylinders | 4 | ||||
Displacement | (L) | 4.837 |
Packaging size | 3480*2000*2500 mm |
Packaging weight | 8330kg |
Rated loader | 5000KGS |
Engine | YUCHAI YCA05115-T480 85KW/114HP Deutz, EPA and Euro 5 engines are available for selection. |
Drive type | 2WD |
Transmission | Full hydraulic transimission |
Tyre | 8.25-15-14PR |

1.Full hydraulic steering system.
Make the steering smoother andquicken to ensure the safety of thedriver.
2.SAFE OVER-GUARD
Integration and beautySturdy and effective toensure safety.


Air suspension dampingHigh elasticity High shockabsorption Multi-levelhardness adjustable.
High quality stainlesssteel.High wear-resistantsealing ring ProtectiveCase.


5.WEAR-RESISTANT TIRES.
Use solid and thick rubber ringsThe ability to adapt to different road levels.
6.BRAND ENGINE
Xinchail 4 CylindersPowerful Disel engine

STRONG MERCHANTS SOURCE FACTORYDIRECT SELLING QUALITY ASSURANCE INDUSTRYEXPERIENCE
More than 100 advanced production and testing equipment.We are a professional and experienced Chinese warehouse equipment manufacturer
25000 SQUARE METERS, EQUIPPED WITH MODERN STANDARDIZED FACTORY BUILDINGS
Specializing in the production of variousmanual hydraulic pallet trucks, manualhydraulic forklifts, oil drum forklifts, platformtrucks, forklift scalesSemi electric fully electric stacker crane andsemi electric vehicle. Electric truck,four-wheel large electric forklift.





Weifang Yishan Heavy Machinery Co., Ltd. is located in Zhuliu Industrial Park, Changle, Weifang City, Shandong, China. The company was established in 2011,We are a professional manufacturer with own design teams more than 15 years time. we accept O E M. The main products are site dumper, wheel loaders, disc mowers, excavators, concrete mixers and other light construction machinery. For a better service we have passed C E certified. and I S O quality management system. Relying on the management level, technical force, the company that has been engaged in the manufacturing of construction machinery after 15 years of research, the production of F C Y series 1 ton to 10 ton engineering site dumper equipment is at the leading level in China; loaders products cover 1 ton To 6-ton, we provide quick change, log grab, grass grab, fork, four-in-one bucket and other auxiliary tools.
Since from 20 11, our product had been exported to more than 40 countries and regions on five continents in the world.
We have professional engineerrs and careful quality checking before shipment. Our company adheres to the principle of "quality first, reputation first" and provides customers with various types of products with quality and quantity assurance.
Nowdays Weifang Yishan heavy machinery reorganized as a S G S verified company. And The company obtained the qualification of national high-tech enterprise in 2024 year!
Weifang Yishan Heavy Industry is willing to work with excellent global agents and distributors to create a bright future together!
Welcome to visit our factory and discuss the business. We are looking forward to receive your inquiries.


A: You have two convenient options. You can send us an email with all the order details, or directly place the order online.
2. How can I make the payment?
A: Once you confirm our Proforma Invoice (PI), we will initiate the payment process. You can pay via T/T. Another option is to start the order through the trade assurance service on the Made - in - China platform.
3. Are you a factory - based supplier?
A: Absolutely. We have been a genuine factory - based supplier for over 17 years. Our in - house technical team is highly skilled and can customize designs according to customers' requirements.
4. What brands of engines are available for site dumpers?
A: Our company selects high - quality engines for site dumpers. You can choose from engines like Changchai, Xichai, Weichai Power, or Cummins diesel engines, among others.
5. What is the order process?
A: Initially, we communicate via email or instant messaging (TM) to finalize the order and production details. Subsequently, we will send you a Proforma Invoice (PI) for your approval. Before commencing production, you will be required to make either a full prepayment or a deposit. Once we receive the deposit, we start processing the order. If the items are not in stock, the production usually takes 7 - 15 days. Prior to the completion of production, we will reach out to you to discuss shipment details and the remaining balance payment. After the payment is settled, we will arrange the shipment for you. For more detailed information, please contact us online or send an inquiry, and we will respond promptly.
