China Factory H20 Timber Beam Table Formwork for Slab Construction Concrete Pouring

Price $90.00 Compare
Min Order 300 Square Meters
Shipping From Jiangsu, China
Popularity 251 people viewed
Quantity
+-
 

YANCHENG LIANGGONG FORMWORK CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
slab formwork
Yes
1year
ISO
Timber Beam
Slab Formwork
Slab Pouring
Yellow, Blue or Customized
3300~5000 mm
2440~3600 mm
5~15kn/Square Meter
Lifting Fork, Shifting Trolley
by Trolley or Crane
2440*4880mm and 3300*5000mm
LIANGGONG
Steel Pallet or Customized
Customized
Jiangsu
Product Description
Product Description

Table Formwork

Table formwork is a kind of formwork that is used for floor pouring, used widely in high-rise buildings, multi-level factory buildings, underground structures, etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting the fork to an upper level and reused, without the need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and reusable. It has eliminated the traditional way of slab support system, which consists of clocks, steel pipes, and timber planks. The construction speeds up obviously, and manpower has been saved greatly.

 

 

Product Parameters



 

Application





Packaging & Shipping

Packing:
1. Generally, the total net weight of the loaded container is 22 tons to 25tons, which needs to be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available at the customer's request. 
---Bulk: Some irregular goods will be loaded in bulk the in the container. 
Delivery: 
1. Production: a For full container, normally we need 20-30 days afreceivingeive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project dem and. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.                   
2. Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with-qualitylity standard produce testTreportsport will be available according to different norms from different regions to offer no worries to clients or meet destination authority requirements.
3. Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly. 
4. Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance aim is to make customers feel at ease and satisfied throughout the process.

 

Company Profile

Yancheng Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, plastic formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.

Company is mainly engaged in management and technical personnel have many years engaged in large Bridges, tunnels, civil engineering construction background, in line with international standards in the domestic first to launch the formwork system of industrialization of professional design, manufacture, the formwork construction specialized subcontracting integration concept, the formwork system to the European advanced technology and domestic mature manufacturing process for effective union, formed a mature and standard formwork technology development, application and service system, greatly improving the domestic construction contracting enterprise in formwork engineering technology integration capabilities, to enhance the domestic construction contracting enterprise comprehensive strength and efficiency.


Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.

Customer Photos

FAQ

Q: Are a you trading company manufacturerture?
A: We are a factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you do need to pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
       If you have another question, please feel free to contact us!

 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA