Injection Mould
Polishing
Single Cavity
PP
Single-Process Mode
Cold Runner
UG
Fixed
Customized
P20
45#
500,000-1,000,000 Shots
60-75 Days
Polywood Case
Taizhou China
8480719090
Product Description
Product Name | China high quality Mould Customized Plastic bottle crate mould |
Model Number | Customized |
Shaping Model | Plastic Injection Mould |
Product Material | Steel |
Mould material | P20/718H (or According to your requirements) |
Mould life | 300000-1000000shots |
Mould base | C45 |
Design software | UG NX AUTO CAD |
Cavity | 1 |
Surface treatment | Polishing/ Texture |
Runner | Hot Runner |
Packaging Details | polywooden case |
Port | Ningbo |
Lead Time | 60days |




Tuofang Mould Factory has already made plastic bottle crate mould, plastic milk crate mould, plastic fruit crate mould, plastic vegetable crate mould and etc.
Tuofang advantage
1. Resonable price
2. Good after service
3. Experienced skilled workers and professional engineers
4. Good quality ,excellent service ,long life mould
5. On time delivery time
6. Send project schedule report and pictures to buyer to show the progress of the mould machining
Tuofang advantage
1. Resonable price
2. Good after service
3. Experienced skilled workers and professional engineers
4. Good quality ,excellent service ,long life mould
5. On time delivery time
6. Send project schedule report and pictures to buyer to show the progress of the mould machining
1 | RFQ | Get the sample or drawing from customer, analyze and quote as per customer requests, make DFM, give some professional suggestions to help customer improve the product |
2 | Negotiation | Discuss about the mould steel, delivery time, payment term and so on |
3 | Place an order | Customer confirms the plastic material, injection machine spec and other details, we start make the design |
4 | Mould design | Make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests. |
5 | Mould tooling | Start the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.) |
6 | Mould processing | Mould process photo or video update to customer each 10 days |
7 | Test sample | T1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve |
8 | Delivery | Once sample approved, we check eavey detials of mould, make sure the mould work well, than will ship the moulds within 7 days after get customer ship |
9 | Shipping | By Sea- Nearest port: Ningbo or Shanghai, By Air- Nearest port: Shanghai or Hangzhou |
We will prepare the some wear parts, like spring, ejector pins, cooling conector, eyeblot.pack with the mould
1.Check mould component
2.Cleaning mould cavity/core and spread slushing oil on the mould
3.Cleaning mould surface and spread slushing oil on the mould surface
4.Put into the wooden case
5. Transport by container

Our company has set its strategic objective which is "high standard, high precision, high efficiency" by taking quality as life. Based on the working-style of "Honesty and Practicality, Persevering Unremittingly, Teamwork Spirit, Achieving Greatness", our company would like to sincerely invite the global prospective customers to pay a visit and have a good cooperation for a splendid future together.



1.Where is your company?
We locate in Taizhou,Zhejiang,China mainland.50 minutes from Luqiao Airport. 20 minutes from Taizhou Railway Station. We warmly welcome you to visiting our company
2.How about your quality control?
We have professional team to control mould quality,since we realize that the quality control is the first prority to run business.
3.What's type of process do u use on mould surface?
1)Mirror polish
2)Texture
3)Chrom Plating treatment on the core and cavity 4
)Nitride & vacuum heat treatment
4.How to approval samples?
1)U can come to have the mould test directly
2)we will send samples&mould running video to u.
Welcome to send inquiry !