Adopt PLC control and servo system adjustment. Use the touch screen to set parameters and switch product models with one click. Changeover time is short. It has fault alarm and prompt functions. High degree of automation and reliable operation.
Product Application.
Used for the production of outer U-plates, back plates, left and right plates, door shells and other parts of refrigerators or freezers
SN. | Name | Description |
1. | Dimensions of the production line | L X W: about 42000mm X7500 mm |
2. | The height of the working surface | from the ground: 900mm |
3. | Product size | Customer provided |
4. | Forming material | t=0.35mm~0.45;PCM |
5. | Production beat | U shell: 1set /80S , back plate: 1set/40S (Customized) |
6. | Number of stations | 8 |
7. | Total capacitance | about 50Kw, 380V, 50Hz |
8. | Total air capacity | 1" about 0.6Mpa; |
9. | Water capacity | 1" (0.3Mpa) industrial water, 20~25 degrees Celsius |


Our main product business is: various automated forming lines, foaming lines, SPM, molds, and production assembly lines in the field of home appliances. The home appliances equipment we develop and manufacture sells well all over the world and are exported to over 30 countries including Algeria Egypt, Saudi Arabia, Pakistan, Iran, Jordan, India, Indonesia, and Mexico.
We insist on "innovation to create the future" and "be the leader in the world's home appliance equipment industry". Based on this strategic objective, under the guidance of the concept of "continuous innovation and customer first", we will vigorously implement the construction of "innovation project, talent project, excellent project and international project".We strive to realize the leap from "Made in China" to "Created in China" for home appliances equipment, and make our own contributions to the development of home appliances equipment in the world.




Q: Are you a factory or a trading company?
A: Factory
Q: How to order?
A: Inquire us → Send product drawings and plant drawings → Inform the basic needs (capacity) of the factory → Receive our technical proposal → Negotiate details → Sign a contract/pay a deposit → Production → Goods are ready → Delivery → Further cooperation.
Q: Which mode of transportation is available?
A: FOB Nanjing
Q: How long does it take for delivery [production] and shipment?
A: The delivery time depends on the specific equipment. Since they are all non-standard equipment, the delivery period ranges from 1 month to 3 months.
Q: How to confirm payment?
A: We accept payment methods such as wire transfer and letter of credit. The specific details can be communicated.
Q: How about after-sales service?
A: We are equipped with professional after-sales service personnel, 7*24 hours response