Chines HSPD Piling Driver Machine GPY158 for Construction Projects

Price $140000.00 Compare
Min Order 1 Piece
Shipping From Jiangsu, China
Popularity 336 people viewed
Quantity
+-
 

Jiangsu Goodeng Heavy Machinery Technology Co., Ltd

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
GPY158
24 HOURS
2000 hours or one year
Pressure Pile Driver
Hydraulic Pile Driver
Hydraulic Hammer
Electric
55kw
Without Noise
ISO 9001:2000, ISO 9001:2008
New
Goodeng
Naked
7.8*2.0*2.8m
China
8501400000
Product Description
Product Parameters

 

NameUnitSpecificationRemarks
Machine weightt58 
Total weight of counterweight iront100 
Total weight of equipmentt158 
Working dimension(L×W)m/ 
Transportation dimensions(L×W×H)m8×2.2×2.7 
Long bridge dimensions(L×W)m8.0×0.9 
Short bridge dimensions(L×W)m2.7×2.2 
Max.piling forcetf158 
Max.piling speedm/min11.5 
Piling stroke per timem1.5 
Max.longitudinal stroke per timem1.8 
Max.horizontal stroke per timem0.5 
Max.rotary angle per time°15° 
Hydraulic system rated pressureMPa22.5(16) 
Effective hoisting pile lengthm12 
Min.side piling spacemm400 
Min.corner piling spacemm1200 
Max.loading pressuretf/m²10.4/12.6 
Vice jawmmФ150~400 150~400 
Product Description


1) High-efficiency and energy-saving constant power hydraulic system.
2) The pile cylinder and motor pump unit are accurately matched and combined.
3) The pile cylinder returns quickly, reducing the time for lifting the pile clamping box, making the construction faster and improving the efficiency of pile pressing.
4) Scientific hydraulic pipeline layout can greatly reduce pipeline losses, hydraulic system losses, and save energy.
5) A static pile driver can be used directly to conduct static load tests on piles.
6) The whole machine is easy to disassemble and assemble, and its modular design makes it easy to transport.
7) The hydraulic cylinder walking has automatic reset and rotation compensation functions. The whole machine has a small grounding specific pressure and is suitable for more sites.
8) Add counterweights (optional) on both sides to lower the center of gravity of the entire machine and make construction safer.
 

Detailed Photos

 

 
Company Profile

"Goodeng Machine" was established in May 2002, is a national high-tech enterprise engaged in R&D, production, sales and service of trenchless machinery, piling machinery, mining machinery, the main products are GS series of horizontal directional drilling machine, GPY series of static pile driver, GM series of surface drilling machine and accessories.
 

After Sales Service

 

FAQ

1. What about the warranty time?

    A:12 months after shipment or 2000 working hours,whichever occurs first.

2. What about the delivery time?
    A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?
    A:On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
      On L/C term, 100% irrevocable L/C without"soft clause" can be accepted. 

4.What logistics ways we can work for shipment?
    A:We can ship machine by sea and road. 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA