Chitherm 1000º C Muffle Furnace Bf216-11 Ltcc Ceramic Sintering Bell Furnace

Price Negotiable Compare
Min Order 1 Piece
Shipping From Anhui, China
Popularity 438 people viewed
Quantity
+-
 

Hefei Chitherm Equipment Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
BF216-11
ISO
Vertical
Industrial
Electric Holding Furnace
Ceramic Sintering
Electric
Air
600*600*600mm
Ltcc Substrates Bbo and Sintering Process
Chitherm
Wooden Package
1520*1520*2250mm
China
8514101000
Product Description
1. Application
This equipment is mainly designed for LTCC sintering, it can also be used for binder burning out and sintering process of other relevant electrical products.

2.T
echnical Specification:
  1. Rated Temperature: 850ºC
  2. Max. Temperature:1000ºC
  3. Chamber Dimensions: 600mm×600mm×600mm(D×W×H)
  4. Effective Dimensions: 400mm×400mm×400mm(D×W×H)
  5. Chamber Insulation Material: Aluminosilicate Ceramic Fiber
  6. Heating Elements: Resistance Coils in Ceramic Fiber Block
  7. Thermcouple: Type K
  8. Temperature Control Point: 4 Points
  9. Pre-Heating: 4 Inlets
  10. 3 Stages Pre-Filtering of air: 1- dust, 2 - water drops, 3 - oil vapor
  11. Temperature Control Precision≤ ±1ºC
  12. Temperature Control Mode: Temperature controller imported from Japan
  13. Heating-up Steps: Default 20 Steps
  14. Temperature Record: IPC makes a real-time sampling record of the chamber temperature and the gas heating temperature
  15. Heat-up Rate ≤6ºC/min 
  16. Chamber Temperature Uniformity:400mm×400mm×400mm (D×W×H) area is better than ± 3ºC
  17. Furnace Surface Temperature ≤ RT+35ºC
  18. Lift System: the equipment lifting operation system adopts three-point control, automated hearth extension,which can be stopped at any time, with stable and reliable operation
  19. Maximum Lifting Trip: 800mm
  20. Loading Weight ≤ 150Kg ( including products and setters )
  21. Total Power: 52kW ( Max Heating Power:40kW, Max Gas Preheating Power:4×3kW )
  22. Outline Dimensions: 1520×1520×2250mm(D×W×H)
  23. Weight: about 1000kg
3.Shipping List
 
 ItemDescriptionQty
Basic ComponentsFurnace 1SET
inspection certificate Certificate of major outsourced components1SET
Technical DocumentsInstructions, technical documents of the major outsourced parts, etc1SET
Key ComponentsHeating ElementsResistance Coils Heating Plate1SET
FlowmeterAzbil/Dwyer/TOFCO/YINHUAN1SET
Differential PressureDwyer/TOFCO/DUWEI1SET
ThermocoupleWatlow/THERMOWAY1SET
Lifting SystemCustomized1SET
Temp. Controller Azbil1SET
PLCSIEMENS1SET
Touch ScreenMCGS ( based on Linux)1SET
Spare PartsSolid State RelayXIMADEN1PC
Heating ElementsResistance Coils Heating Plate1 PC
 
4. Facility Requirements
  1. Atmosphere Conditions: dry, clean, oil-free compressed air, working pressure of 0.2-  0.4MPa, gas consumption of 25-70 m3/h
  2. Environmental Conditions: temperature: 0~40ºC, humidity≤80%RH, no corrosive gas, no strong airflow disturbance
  3. Ventilation System: non-contact access to the user pumping system, pumping capacity is greater than 100 m3/h
  4. Ground Requirements: horizontal, no obvious vibration, load-bearing>500 kg/m2;
  5. Power: capacity> 70KVA, 3-phases 5-lines, voltage 220 / 380V, frequency 50Hz. Fire line: yellow, green, red, Zero line: blue, Ground line: yellow-green;
  6. Installation Site:3500mm×3000mm×3000mm(D×W×H), with an installation area greater than 11m2.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA