Chitherm 1100º C Electric Furnace Hwf160-10nh Vacuum Furnace

Price Negotiable Compare
Min Order 1 Piece
Shipping From Anhui, China
Popularity 366 people viewed
Quantity
+-
 

Hefei Chitherm Equipment Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
HWF160-10NH
ISO
Vertical
Industrial
Electric Holding Furnace
Ceramic Sintering
Electric
Vacuum/Nitrogen/Hydrogen
500*500*650mm(W*H*D)
Chitherm
Wooden Packaging
1650*1950*2000mm(W*H*D)
China
8514101000
Product Description

1. Application:

This furnace is mainly designed for soldering process of metal parts and HTCC package, also can be used in other processes such as decarburization, annealing, quenching, scorching, hardening, thermal decomposition.

2. Technical Specification:
  1. Rated Temp: 900ºC
  2. Max Temp: 1100ºC
  3. Atmosphere: N2, H2, with humidification
  4. Oxygen Content: Measured by O2 content analyzer
  5. Muffle Material: SUS 310S
  6. Muffle Dimensions: φ750mm×900mm(d×D)
  7. Effective Chamber Dimensions: 500×500×650mm(W×H×D)
  8. Loading Method: Manual, through horizontal guideway shelves
  9. Heating Method: Resistance wire pre-built heating plate
  10. Cooling Method: Air cooling with blower
  11. Temp. Control Stability: ± 1ºC(controller with P.I.D function)
  12. Profile Steps: Default 20 steps
  13. Temp. Uniformity: ± 5ºC 
  14. Thermcouple: Type K
  15. Temp Control: 3 Points
  16. Temp. Measurement: 1 Point
  17. Max. Heating Power: 40kW
  18. Typical Insulation Power:  25kW
  19. Heating Speed: ≤ 5ºC/min
  20. Furnace Surface Temperature: ≤ 40ºC
  21. Max Vacuum Value: ≤ 10Pa
  22. Exhaust System: 1 exhaust port on the top with H2 igniter
  23. Alarm System: audible and visual alarm in case of over temp, thermcouple broken, low air pressure, low water pressure, substandard vacuum level, etc
  24. Weight: 1500kg
  25. Appearance Colour: Light Grey
  26. External Dimensions: 1650mm×1950mm×2000mm (W×H×D)


 
3. Delivery List
Table 1 Delivery list
 ItemNoteQty.
Basic ComponentsFurnace 1 SET
inspection certificate Certificate of major outsourced components1 SET
Technical DocumentsInstructions, technical documents of the major outsourced parts, etc1 SET
Key ComponentsHeating ElementResistance wire pre-built heating plate1 SET
Vacuum System 1 SET
Touch Screen 1 SET
Temperature ControllerAzbil, CHINO or equivalent brand1 SET
ThermocoupleType N3 PCs
PLCSIEMENS or equivalent brand1 SET
Spare PartsSSR 1 PC
Sealing ring 1 PC


4. Facility Requirements
  1. Environmental Conditions: temp.: 0~40ºC, humidity ≤ 80%RH, no corrosive gas, no strong airflow disturbance
  2. N2 Conditions: 99.999% purity, working pressure: 0.2-0.4MPa, Max gas consumption 2-6 m3/h
  3. H2 Conditions: working pressure: 0.2-0.4MPa, Max gas consumption 1-3m3/h
  4. Compressed Air Condition: dry, clean, oil-free, working pressure: 0.4-0.8MPa
  5. Water Conditions: clean, no corrosive water, working pressure 0.1-0.3MPa, 3-9L/min
  6. Ventilation System: non-contact access to the user pumping system, pumping capacity is greater than 15m3/h
  7. Ground Requirements: horizontal, no obvious vibration, load-bearing> 500 kg/m2;
  8. Power Condition(TBD): capacity > 55kVA, 3-phases 5-lines, voltage 220/380V, frequency 50Hz. Fire line: yellow, green, red, Zero line: blue, Ground line: yellow-green;
  9. Installation Site: 3000mm×2500mm×3000mm(D×W×H), with an installation area greater than 7.5m2.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA