PPGI
Available
20 Years
ASTM, JIS, GB, AISI, DIN, BS
ISO, RoHS, IBR
Coated
Cold Rolled
Building Material
Mill
Stock
A653,Dx51d,SPCC,SGCC,CGCC,S350gd
3-8tons
40-275G/M2
Galvanized Dx51d SGCC Prepainted Steel Coil PPGI
0.12-4mm
Ral System Colors
as Requirements
665mm-1050mm
Wooden Pallet
Fob/CIF/CFR/CNF/EXW
Available
by Sea,by Air,by Express
Front:10-25 Microns,Back:3-20 Microns
10-15days
Color Coated
puneng
Wooden Pallet
as requirements
China
72193500
Product Description
Product Description
Name | PPGI/GI/PPGL/GL/COLOR COATED COIL |
Standard | ASTM/JIS/EN/DIN/GOST/GB ETC |
Raw material | SGCC, SPCC, DX51D, SGCH, ASTM A653, ASTM A792 |
Certificate | ISO9001. ISO14001. |
Surface Treatment | Chromated, oiled, anti-finger, etc |
Thickness | 0.12mm-6.0mm |
Width | 600mm-1250mm |
Length | As ruquired |
Tolerance | Thickness+/-0.01mm Width +/-2mm |
Zinc coating | 40-275g /m² |
Color options | RAL Color System or as customer's color sample. |
Coil weight | 3-8 Tons or as required |
Coil ID | 508-610mm |
Application | Industrial and civil construction, steel structure buildings and producing roofing sheets. |
Hardness | Soft & Full Hard or As Per Customer Request. |
Packing | Export standard package. Inner 3mm steel sleeves, wrapped by waterproof paper, then steel sheets outside trapped. |
Payment term | T/T OR L/C |
Delivery time | Around 15-20 days after T/T payment or L/C is received. |
Q:Can you send samples?
A:Of course, we can send samples to all parts of the world, our samples are free, but customers need to bear the courier costs.
Q:What product information do I need to provide?
A:You need to provide the grade, width, thickness,coating and the quantity you need topurchase.
Q:What are the shipping ports?
A:Under normal circumstances, we ship from Shanghai, Tianjin, Qingdao, Ningbo ports, you can choose other ports according to your requirements.
Q:About product prices?
A:Prices vary from period to period due to cyclical changes in the price of raw materials.
Q:How long does your delivery time take?
A:ln general, our delivery time is within 7-15 days, and may be delayed if the demand is extremely large or specia circumstances occur.
Q:Canl go to your factory to visit?
A:0f course, we welcome customers from all over the world to visit our factory. However, some of the plants are not open to the public.
Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested forquality before packaging, and ungualified products wilbe destroyed.
Q:How to pack the products?
A:Theinner layer has a waterproof paper outerlaverwithironpackagingandis fixedwitha fumigation wooden pallet. lt careffectively protect products from corrosion during ocean transportation.