100-1200mm*1500mm or Customized
Online Technical Support
1 Year
ISO, CE
Steel
Wall Formwork
Combined Steel Formwork
Concrete Construction
Orange Blue
100-1200mm
1500mm
Spray Painted
Graphic Design
Concrete Site
Spot Supply
Zhongtai
Bulk
100-1200mm*1500mm or Customized
Shandong China
7308400000
Product Description
Steel formwork is widely used in highway, railway and bridge projects. Our formwork products are of high quality, easy to operate and use, and have a high reuse rate, ensuring the smooth and fast completion of the project.
Flat steel formwork is the most common tool used to manufacture mechanical parts, hardware molds or product models. It is made of high-strength high-quality steel through special processing technology.
Flat steel formwork (customizable)
Product type | 1015 | 2015 | 3015 | 4015 | 5015 | 6015 | 10015 | 12015 |
Width (cm) | 10 | 20 | 30 | 40 | 50 | 60 | 100 | 120 |
Length (m) | 1.5m | |||||||
Panel thickness (mm) | 3mm&5mm |









The company's products are widely used in the construction of bridges, roads, railways, subways, integrated pipe corridors, power stations, airports, water conservancy, tunnels and other engineering projects.




1.Are you a trading company or a manufacturer?
We are an industry-trade company.
2.What do you do?
We design and manufacture formwork and scaffolding products for concretestructure pouring in engineering projects such as bridges, highways, railways.subways, comprehensive pipe galleries, power stations, airports, waterconservancy,tunnels,etc.
3.How long is the delivery(production) and shipping time?
If the goods are in stock, we will arrange shipment within 3-5 days after receivingyour down payment. lf the goods are out of stock, they will be determined based onthe quantity.
4.Why do you buy from us instead of other suppliers?
1. Professional team, 12 years of market experience;
2. Own source factory supply, production capacity of 300,000 tons/year;
3. One-stop service center to meet all steel formwork needs;;
4. 24-hour online service
5.How to confirm payment?
1. T/T: 30% T/T of the advance deposit and 70% T/T of the balance before delivery;
2.Letter of Credit:100% irrevocable letter of credit