Competitive Price for Power Distribution Outdoor Application Box Substation Prefabricated Substation

Price $8000.00 Compare
Min Order 1 Piece
Shipping From Zhejiang, China
Popularity 416 people viewed
Quantity
+-
 

TENLEE ELECTRIC GROUP CO., LTD

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
YB
CCC, ISO9001
Stainless Steel
Medium Voltage
Fixed
Cabinet
AC
7.2kv/12kv
200-630A
1000m
Steel, Wood, Composite Plate
IEC1330
TENLEE
Wooden
China
8535210000
Product Description
Product Description

1.Structure features
YB series prefabricated substation is composed of high voltage power distribution equipment, transformer and low voltage 
power distribution equipment, divided into three functional compartments, which are high voltage room, transformer room and low voltage room. 


2. Enclosure types
General substation which is made of ordinary steel plate 
High anti-corrosion type substation which is made of stainless steel or aluminum alloy plate 
Heat preservation and insulation type substation which is made of colored composite plate 
Other kinds of substations


3. Layout types
YB series prefabricated substation types:

YB series prefabricated substation have two arrangements, "mu" type (YBM) "pin" type (YBP)

----- "mu" type


------- "pin" type

 

4. typical looks of prefabricated substations

Product Parameters
No Item Unit High voltage transformerLow voltage
1Rated voltageKv 7.2/126/0.4      10/0.40.4
2Rated capacityKVA 200-1250/50-80
 
MAX  2X1600
3Rated current 200-630 100-3000
4Rated breaking current400-630 15-63
5Rated short time withstand currentKA/s20/2200-400kva15X1
12.5/4400kva30X1
6Rated peak withstand current KA 31.5, 50200-400kva30
400kva63
7Rated making current KA31.5, 50  
81min power frequency withstand voltage KVPhase to phase
Phase to earth 30/42
Oil immersed: 35/5min300v:2kV
Breaks 
34/48
Dry: 28/5min300, 660V:2.5kV
9Lightning impulse withstand voltageKVPhase to phase
Phase to earth 60/75
75 
Breaks 
75/85
75 
10Noise level dB Oil immersed:<55
Dry type: <65
 
11Protection degree  IP 33D/IP 23D 

 

Packaging & Shipping

standard package: wooden box
delivery time of sample: 20 days

fast shipping:

economic shipping:


Company Profile

Combining manufacturing experience, new technology and industrial knowledge, TENLEE aims to build advanced power distribution and protection systems. 
TENLEE is specialized in manufacturing a comprehensive range of solutions from 12kv to 40.5kv for indoor/outdoor systems: gas insulated switchgears 
ring main unit
sf6 free switchgears
vacuum circuit breakers
sf6 circuit breakers
reclosers 
load break switches
disconnectors
distribution transformers/power transformers
substations 


 

FAQ

 

1. What is the standard?
IEC1330-1995 <High Voltage/Low Voltage Pre-fabricated Substation> 

2.What is the delivery time:

Usually the delivery time is within 30 days.

3.Can you supply a sample?
Yes, of course.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA