Control Valve Assemblycustom Valve Body Assembly Equipment Natural Gas Oil Pressure Regulation

Price $40000.00 Compare
Min Order 1 kg
Shipping From Guangdong, China
Popularity 368 people viewed
Quantity
+-
 

Shenzhen Tianluo Automation Equipment Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
sprinkler intubator
Rigid
Non Flow Production Line
Assembly
Parts Production Line
Agile Manufacturing
ISO, ABS
New
Automatic
Overseas Service Center Available
300
HMI Operation
Disposable Razor Automatic Assembly Machine
None
Stainless Steel + Aluminum Alloy
1 Year
Greatly Efficiency
Provided
New Product 2022
PLC, Engine, Pressure Vessel, Gear
Assembly Line
220V/380V/50Hz(as Customers' Request )
Automatic Production Line Stacking Machine
Tianluo
Export Carton Wooden Case
Aluminium alloy
Guangdong, China
8479899990
Product Description
Company Brief

Shenzhen Tianluo established for 15 years, we successfully served over 1,500 factories and helped them fullfil automatic production line since 2008.

We mainly supply: Customization of Automation Equipment, Full-automatic assembly and production equipment, Full-automatic inspection, Testing and Packing equipment, Robotics and Industrial vision integration applications. 

ALL the machines are designed by components and structure of the product. According to production procedure, the following systems may be added: automatic feeding bowl, feeding line, visual inspection system, various testing system, automatic dispensing oil or glue ,welding, riveting, screwing, printing, sealing, capping, drilling, filling,tapping, milling, forming,packing... Our work is to finish the automatic streamline design and make it into a set of high-stable and hign-effective automation equipment.

To make evaluation and machine design, your samples is necessary.

 

Related Products

 

Disposable infution set assembly machine                   Hinge assembly machine

 

Wall socket assembly machine                                       

Reset switch assembly machine

   

 

 

Product Function

      This equipment is suitable for the Parts assembly. It adopts PLC control system to automatic feeding, automatic assembly ; it greatly improves production efficiency, reduces workers and reduces costs.

 

Product nameAutomatic plastic parts or metal parts assembly machine
Product modelTL-A0058
Working modeAutomatic/ Semi-automatic
Working space2200*1700*1500mm (customizable)
Voltage220V/380V 50Hz
capacity600-4800pcs/H (customizable)
Operator1people
CylinderAirTAC
PLCMitsubishi
Servo motorDelta / MITSUBISHI/ INOVANCE
TrackHIWIN / contractor
SensorPanasonic

 

 

 

 

 

 Machine Structure:


1. Electronic control: touch screen, PLC control; 

2. Gas into components: cylinder drive, optical fiber sensor; 

3. The structure sliding part is made of high speed steel, which is stable wear and good fixity;
4. One year warranty; 

5. Alarm indication;
 

Main Features:

1. This series machines is designed and manufactured specifically for the razor assembly industry.

2. Automatic detection, automatic start when material is detected, automatic stop when lack of material.

3. Automatic counting , set output.

4. Using the touch screen, intuitive interface, simple and safe operation.

5. Abnormal shutdown, automatic alarming when reporting abnormal information.

 

    Can be designed and customized for customers, to a greater extent to meet the technical needs of different products.

 

 

Company Information

Customer cooperation

Overseas customers come to our company for experience and cooperation.

 

FAQ

1. Are you a factory or trading company?

We are an CE and ISO proved manufacturer specialized in R&D and manufacture of Automatic Machines since 2008. Our strength is to help you design your own machines, control your budget and improve production effiency.

2. Who are you working with?

We work with production factories, trading companies, and automation equipment wholesellers from over 38 countries.

3. To get quotation to custom the automatic machinery, what should we do?

a. 2D/3D product drawings.

b.  Production Capacity request

C.  Your product samples for evaluation.

 4.  Where is your factory located?

Our factory is located in Shenzhen,China. One of the most developed industirial cities in China. Here we have most mature supply chain and best mechanical engineers.

5. Should we trust your quality and after-sales service?

a. 1 year quality warranty

b. We offer spare parts after 1 year

c. Engineers onsite or video guidance for installation and troubleshooting

6. How about the shippment?

A: The machine will be carefully protected by foam, then put into wooden box, then put into container. So the machine would be shipped in good condition.

7. How about payment terms and lead time ?

A: 50% T/T deposit upon the contract/PI signed , balance be paid after inspection of machine(Client onsite or video inspection). The machine will be ready after 45-60days after deposit received. However, in peak season, the lead time should be 90-120 days.

 

 

 

 

 

 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA