Cooling Tower Spare Parts Water Distribution Marley Ns5 Counterflow Nozzle with Assembly Spray Arm and Diffusion Ring

Price $10.00 Compare
Min Order 100 Pieces
Shipping From Hebei, China
Popularity 218 people viewed
Quantity
+-
 

Hengshui Nuokon Technology Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
Yes
12months
Cross Flow
Mechanical Ventilation
PVC
Wet
Closed
Square
Ordinary
Industrial
ISO, SGS
New
Marley Cooling Tower Ns5 Spray Nozzle
Carbon Black, Grey, etc
as The Picture
Water Distribute in Marley Cooling Tower
ABS, PP
12 Months
12g
Nuokon
Paper Carton
as the picture
China
3926909090
Product Description
Product Description

Cooling Tower Spare Parts Water Distribution Marley NS5 Counterflow Nozzle With Assembly Spray Arm And Diffusion Ring

The orifice sizes (1"-3 1/2") of NS nozzles are large enough that many competitive nozzles will actually fit inside a nozzle. NS5 counterflow nozzles have no internal parts or narrow passageways. The attached diffusion ring will not retain even fibrous debris.

"Full cone" distribution pattern assures uniform water distribution for all film fills. Minimal spray overlap is required, providing uniform water distribution even near spray boundaries. NS counterflow nozzles develop uniform water distribution over a wide range of operating water pressures.

Product Parameters

The Specification of Marley Cooling Tower Spare Parts Water Distribution Counterflow NS5 Nozzle:

MaterialABS
Length100mm 
Weight 0.25kg
ColorBlack and White
Structure FormUpper and Lower Structure
Maximum water temperature75
Assembly formPress the self-locking
CertificationSGS
On-site installationCombined with the nozzle stents
Certification overseas technical supportYES
Detailed Photos

Detailed pictures for Cooling Tower Spare Parts Water Distribution Marley NS5 Counterflow Nozzle With Assembly Spray Arm And Diffusion Ring

Packaging & Shipping

Package of Cooling Tower Spare Parts Water Distribution Marley NS5 Counterflow Nozzle With Assembly Spray Arm And Diffusion Ring

paper carton or or as your request.

 
Installation Instructions

Installation of Cooling Tower Spare Parts Water Distribution Marley NS5 Counterflow Nozzle

The nozzles must attach to their supply pipe or adapter by means of screwed connections. Each nozzle must incorporate a locking device to assure a rigid connection to the supply pipe or adapter. Each nozzle must be readily removable and replaceable without the use of tools or adhesives.

Related products

Related products of Marley cooling tower:




Other various cooling tower spare parts:
cooling tower pvc fill materials:

cooling tower nozzles:

cooling tower drift eliminators:
Company Profile

 

FAQ

1.Q: Are you Trading Company or Factory:

  A:.  We are Trading Company and also Factory

 2.Q: What's your production ability for one month?

    A:We can product Metric Tons per Month 200000 pcs  .

 3.Q:  What's your MOQ?

    A:100pcs

 4.Q:What's your shipping port?

   A:Tianjin,shanghai or any port as your reqirement 

 5.Q: What's your Payment Terms?

   A:L/C,T/T,Western Union  

Try order is acceptable. Sample is available.

Welcome to inquire, we will feedback within  24 hours.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA