Corn Starch Processing Line Corn Starch Plant

Price $250000.00 Compare
Min Order 1 Set
Shipping From Beijing, China
Popularity 435 people viewed
Quantity
+-
 

Beijing Liretec Starch Technology Co., Ltd

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
Repair,Replacement of Parts
1 Year
Flour
380V
ISO
Steel
20ton/H
XRT
Sea Transportation
Strainless Steel
Beijing, China
8438600000
Product Description

High Conversion Rate Corn Starch Process Machinery Line
 

Advantages

 
1. High extraction rate 

Using multi stage hydrocyclones for concentrating, the advanced process design assure the extraction rate more than 92%
2. Low water consumption 
It needs 5- 8 tons of water for each ton starch, much less than those traditional equipments which need 15 - 25 tons water.
3. Large in capacity 
Each production line can process 35 tons of potato, 25 tons of sweet potato, or 25 tons of cassava for one hour. 
4. Closed system 
All equipments and tanks are closed, they are connected by pipelines, there is no open device so that it can ensure that the production line has good performance and a clean and hygienic environment.
5. Fully automated design
It can save time and labor power, meanwhile the quality of the product produced is also guaranteed, such as the online cleaning function, it can make whole production system cleaned completely. 

 

Main Equipments



Technical Parameter

ModelPower(KW)Capacity(kg/h)Dimension(mm)
P X 6580100-15021000x1200x2200
P X 70110200-2402300x1500x2200
P X 85130350-4002800x3500x4300
P X 95100800-10003000x3500x4300
P X 1201351500-200030000x3500x5200

FAQ

Q:Are you a trade company or a manufacturer?
A:We are a manufacturer, and welcome to visit our factory and check the machines.
Q:How long is your delivery time?
A:Generally it is 10days when goods are in stock, or it is 35days if the goods are not in stock. We could discuss before contract.
Q:Could you supply all the parameters about the machines?
A:Yes, We will supply all the parameters, price layout drawing, factory desion etc.
Q:What is your terms of payment?
A:30% T/T in advance , 70% balance before shipment after in spection.
Q:How about the after-service?
A:We will send engineers to the buyer's factory for 7-14 days period installation and training to the operatiors.
Q:Do you supply any formula to buyer?
A:Yes, we supply formulas to buyer.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA