custom plastic injection mold service
1 Years
Injection Mould
Polishing
Multi Cavity
ABS
Progressive Die
Car, Household Appliances, Furniture, Electronic
Hot Runner
Pro-E
Fixed
HASCO
Customized
1 Years
P20hh
Yudo
20-30days
xianghao
Woodbox
123*73*135mm
China
8480719090
Product Description
Plastic Injection Molding Description:
Cavity Material:1.2738,1.2343, 1.2344, S7, H13, P20HH, GS738H, LKM738H, 718, 8407, S136, Calmax 635 NAK80,
SKD-61,NIMAX, 45#, 50#, Aluminum for prototype mold etc.
RunnerCold runner or Hot runner :YUDO/ HUSKY/MOLD-MASTER/SYNVENTIRE/INCO/ MASTIP/ HASCO/ DME
GateSubmarine:gate, tunnel gate, side/edge gate, direct gate, pin point gate, sprue gate, diaphragm gate, fan gate, cashew gate, hook gate, hot tip, hot drop, valve gate etc.
Plastic material for parts: PS, SAN, PA, POM, ABS, PP, PET, PC, PE, HDPE, PA66+GF, PVC, TPE, TPU, TPV etcProcessCNC, high speed carve, EDM ,wiring-cutting, drill, polish etc.
Lead Time:10-30 work days depends on the structure and size of products
Package: Wooden Case Package or according to customer requirement.
Price Term: EX Works, FOB NINGBO, China, CFR, CIF, DDU, DDP.
Product Process:
1. Mold Design Control
2. Mold Steel Hardness Inspection
3. Mold Electrodes Inspection
4. Mold Core and Cavity Steel Dimension Inspection
5. Mold Pre-Assembly Inspection
6. Mold Trial Report and Samples Inspection
7. Pre-Shipment Final Inspection
8. Export Product Package Inspection




Cavity Material:1.2738,1.2343, 1.2344, S7, H13, P20HH, GS738H, LKM738H, 718, 8407, S136, Calmax 635 NAK80,
SKD-61,NIMAX, 45#, 50#, Aluminum for prototype mold etc.
RunnerCold runner or Hot runner :YUDO/ HUSKY/MOLD-MASTER/SYNVENTIRE/INCO/ MASTIP/ HASCO/ DME
GateSubmarine:gate, tunnel gate, side/edge gate, direct gate, pin point gate, sprue gate, diaphragm gate, fan gate, cashew gate, hook gate, hot tip, hot drop, valve gate etc.
Plastic material for parts: PS, SAN, PA, POM, ABS, PP, PET, PC, PE, HDPE, PA66+GF, PVC, TPE, TPU, TPV etcProcessCNC, high speed carve, EDM ,wiring-cutting, drill, polish etc.
Lead Time:10-30 work days depends on the structure and size of products
Package: Wooden Case Package or according to customer requirement.
Price Term: EX Works, FOB NINGBO, China, CFR, CIF, DDU, DDP.
Product Process:
1. Mold Design Control
2. Mold Steel Hardness Inspection
3. Mold Electrodes Inspection
4. Mold Core and Cavity Steel Dimension Inspection
5. Mold Pre-Assembly Inspection
6. Mold Trial Report and Samples Inspection
7. Pre-Shipment Final Inspection
8. Export Product Package Inspection



