Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
Type | Pier pillar formwork | Specification | Q235B |
Panel thickness | 6mm | Width | 500-6000mm |
Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system is the epitome of strength and durability, making it a perfect choice for reusable applications in construction. Its ease of assembly and erection, coupled with a fixed shape and structure, renders it ideal for projects requiring multiple identical structures, such as high-rise buildings, roads, and bridges.



Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, subject to confirmation prior to loading.2. We employ various packaging methods tailored to different products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged before being placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Certain irregular items are loaded in bulk within the container.
Delivery:
1. Production: For a full container, standard production time is 20-30 days following receipt of the customer's down payment.
2. Transportation: The duration depends on the destination charge port.
3. Special requirements can be negotiated as needed.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil-making company, operating out of two dedicated factories.
Q2: What is your main business?
A: We excel in designing and manufacturing formwork products specifically forbridges and tunnels.
Q3: What services do you offer?
A: We provide valuable suggestions, detailed formwork layout drawings, and competitive quotations for construction projects to owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers by supplying them with our exceptional formwork products.
Q4: How long does it take to draft a preliminary design and quotation after we submit structural drawings?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products ordered.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.