Custom Steel Formwork for Adjustable Columns

Price $1050.00 Compare
Min Order 1 Ton
Shipping From Beijing, China
Popularity 481 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our steel formwork system is the epitome of strength and durability, making it a perfect choice for reusable applications in construction. Its ease of assembly and erection, coupled with a fixed shape and structure, renders it ideal for projects requiring multiple identical structures, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, subject to confirmation prior to loading.
2. We employ various packaging methods tailored to different products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged before being placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Certain irregular items are loaded in bulk within the container.
Delivery:
1. Production: For a full container, standard production time is 20-30 days following receipt of the customer's down payment.
2. Transportation: The duration depends on the destination charge port.
3. Special requirements can be negotiated as needed.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil-making company, operating out of two dedicated factories.

Q2: What is your main business?
A: We excel in designing and manufacturing formwork products specifically forbridges and tunnels.

Q3: What services do you offer?
A: We provide valuable suggestions, detailed formwork layout drawings, and competitive quotations for construction projects to owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers by supplying them with our exceptional formwork products.

Q4: How long does it take to draft a preliminary design and quotation after we submit structural drawings?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products ordered.

Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA