Customization Label Sticker Digital Roll to Roll Flexo Paper Printing Semi Cutting Machine

Price $4000.00 Compare
Min Order 1 Set
Shipping From Zhejiang, China
Popularity 213 people viewed
Quantity
+-
 

Zhejiang Newsun Machinery Technology Co., Ltd.

VIP   Audited Supplier 14 years
Profile Certified by SGS/BV
JM-320H
After-Sale Services Available
Slitting and Rewinding
High-Speed Slitting Machine
Flat Knife Slitting
Cutting Part
Film
Flexible Packaging
Process Materials
Film Cutting
Plastic
BOPP, Pet, CPP, PVC, etc.
PLC
Vector Frequency Inverter
Vector Frequency Converting
10kw
Newsun
Export Wooden Case
CE
Ruian
84411000
Product Description
Customization Label Sticker Digital Roll to Roll Flexo Paper Printing Semi Cutting Machine


The main technical parameters
Cut the fastest speed400 meters/minute
Put the maximum diameter650mm
The maximum diameter of the receipt500mm
Maximum feeding width320mm
Section of accuracy± 0.10mm
Total power10KW
Power voltage1P 220V 50Hz
Net weightabout 1050kg
Machine size (length*width*height)2000*1250*1450mm

Description of the main parts

The material and correction part
A. Raising axis (can be automatically filled with gas)
B. Integrated correction devices (Shenzhen Ensius)

C. Switching servo motor 2.3kW (Zhejiang Dongling)
D. Electric eye (no -paper stop)



Take the paper part
A. Pulling rubber roller+steel roller
B. Drag servo motor 2.3kW (Zhejiang Dongling)

C. Micia wheel, encoder
D. counter


Slitting part 
A. Divide the knife (7 sets)
B. System cutting system

C. Gear


Waste edge exhaust parts
A. Wind -absorbing fan 750W

Double rewind parts
A. Change the axis (automatic roll flip function)
B. Receive roll gas rising axis (2) (can be automatically charged and placed air)

C. Receive roll servo motor 2.3kW (2) (2 can be achieved at the same time of closing scrolls at the same time)
 

Pre-sales issues

01. How to get in touch with us?

Call us directly 
Direct to the company: National Road 104, Songqiao Industrial Zone, Wanquan Town, Pingyang County, Zhejiang Province, China

02. How to answer technical guidance?

For some customers who need non-standard equipment, we will communicate with the company's relevant technical personnel according to the customer's specific requirements, taking into account the technical feasibility and production costs, and give customers solutions.

03. How to recommend products?

We have nearly 14 products in four series. We can also provide non-standard equipment production and new product development services according to customer requirements. According to the customer's requirements to be produced, the purpose of the product to be purchased, the environment, the purchase volume and other related conditions, we will recommend several cost-effective products for the customer to choose.

04. How to make a quotation?

Based on our company's research and development costs, production costs and customer purchases, we conduct calculations to determine the price of the product.
 

Problems in sale

01. About payment

After signing the contract, 30% of the total payment will be paid in advance, and the factory will accept the payment and pay the full amount of the machine for delivery.

02. About delivery time

About 45 working days after receiving the deposit (non-standard machine), the factory will re-decide whether to change the delivery date when the order is confirmed. The standard machine is generally within 30 working days after receiving the deposit

03. Order tracking

After the customer places an order, our company will send professional personnel to track the order and regularly report the production progress to the customer. Customers can check the order status on the official website (delivery query).

04. Product testing

During the production process, our company will adopt strict inspection process to ensure product quality. Through internal inspection, we ensure that the components produced by our company meet the technical requirements; through external inspection, we ensure that the components produced by our company are not subject to quality problems; and then pass the whole machine inspection to ensure that the mechanical equipment meets the technical production requirements .

05. Product packaging

Before the product is shipped, it will be packed in a strict vacuum plus bottom tray (wooden tray or steel tray)

06. Product Transportation

Products are generally shipped from Ningbo Port, China to the destination port by sea.
 

After sales question

01. Shelf life/warranty period of the product

The product warranty period is generally one year, and our company provides lifetime maintenance services. If the machine has quality problems, our company will help the customer to solve it through the following ways: a. Send spare parts to the customer. b. Remotely assist customers in maintenance. c. Notify our agent company to send personnel to the customer's factory for maintenance. d. Our company directly dispatches relevant personnel to the customer's factory for maintenance.

02. About transportation damage

In the process of product transportation, if product damage occurs, it is determined that our product packaging and reinforcement work is not in place, and our company will bear the corresponding losses.

03. About machine maintenance

We will contact customers on a regular basis on how to maintain and maintain the machine. For domestic customers, we will have a master to provide on-site service.

04. Problems during use

If there is any problem in the process of using the product, the customer can directly call or send an email to our after-sales department (24-hour hotline). The personnel of our department will respond immediately and make a decision on the response measures within 24 hours.




Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA