Customized OEM MIM Powder Metallurgy Sintering Hardware MIM Parts Metal Injection Molding Part for Automatic Pilot Auto Medical Electronics Manufactur

Price $9.90 Compare
Min Order 1000 Pieces
Shipping From Zhejiang, China
Popularity 492 people viewed
Quantity
+-
 

Bestpro (Ningbo) Precision Manufacturing Co., Ltd

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
MIM
ISO9001
Acrylic Binder
MIM
10 PCS
Sample: 5-7 Day, Bulk Order 20-45 Day
Metal Injection Molding, Metal Powder Sintered
100% Inspection Before Shipment
E-Coating,Zinc ,Polishing, Sandy Blasting, Galvani
Machinery Parts,Auto Parts, Medical Equipments, Et
Prototypes to End-Used Production
0.01-0.05mm
Titanium Alloy , Stainless Steel , Copper
Fob, EXW, CIF, DDP
BestPro or Customized
Wooden Box or Carton
Customized
Ningbo
Product Description
Product Description


FAQ
1. Which payment methods are accepted?
At BestPro, we accept payment methods such as T/T bank transfer and Paypal.
2. What file formats do you work with?
The file formats we can accept include dwg, iges, stp, and pdf.
3. Only have a sample, no drawings. Can you complete the task?
Certainly. Our design engineers can draft technical drawings from your sample and manufacture the product accordingly.
4. How do you ensure good quality?
At BestPro, quality is our top priority. We implement robust systems, including pre-article inspections, in-process checks, and final inspections. With advanced equipment like CMM for precision measurement, we ensure exceptional quality control, earning the trust of our customers.
5. Do you have a minimum order quantity?
NO!-No minimum quantity! BestPro provides prototypes and short tomedium-run production machining services.
6. What precision tolerances can BestPro achieve?
Precision Machining Tolerances down to +/- 0005mm. BestPro can manufactureand inspect tight tolerances per your drawing specifcations.
7. What general tolerances can BestPro achieve?
General Machining Tolerances on metal to +/- 0.005mm unless otherwisespecifed. Plastics and composites will be +/- 0.0254mm.
8. How quickly can l get my parts?
Lead times are 2 to 3 weeks for prototypes and 4 weeks for production runs. Emergency and rush services are available.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA