GA-2400
Nonstandard
Corrosion-Resistant, Wear-Resistant
Textile Machinery, Packaging Machinery, Motorcycle, Food Machinery, Car
Polishing
Stainless Steel
Available
Anodizing
0.01
Numerical Control
15
Great Advance
Wooden Boxes
Customized
Qingdao China
Product Description
Product Parameters
Item | Specifications | |
1 | Materials | Carbon steel: 12L15, 45#, 42CrMo; |
Stainless steel: 303, 304, 316, 420, 630; | ||
Aluminum alloy: 6061, 6063, 5052, 7075; | ||
Copper alloy: brass H58-H63, phosphor bronze, beryllium copper; | ||
Pure copper: T0 oxygen-free copper, T2 red copper; | ||
Plastics: nylon, bakelite, POM, PEEK; | ||
2 | Diameter | Customize |
3 | Diameter tolerance | 0.01mm |
4 | Hardness: | HRC/HV |
5 | Length | 0.5mm-500mm |
6 | Heat treatment | Oil Quenching |
High frequency quenching | ||
Carburization | ||
Vacuum Heat treatment | ||
Mesh belt furnace heat treatment | ||
7 | Application | Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery |
8 | Drawing Format | 2D/(Pdf/CAD)3D(Iges/Step) |
9 | Surface treatment | Electrolytic plating (barrel plating, rack plating); |
Electroless plating (nickel plating); | ||
Ordinary sandblasting and anodizing (black, silver, gray, gold, red) | ||
Plastic spraying, spraying metal paint, etc.; |
Detailed Photos
Machining Workshop
Certifications
Quality Control
Our Customer
FAQ
Q1:What's kinds of information you need for quotation? |
GA: You can provide 2D/3D drawing or send your sample to our factory, then we can make according to your sample. |
Q2: Can we sign NDA? |
GA: Sure. We never divulge customers' information to anyone else. |
Q3: Do you provide sample? |
GA: Yes, we can provide you sample before mass order. |
Q4: How can you ensure the quality? |
GA: We have profesional QC department to guarantee the quality. |
Q5: Delivery time |
GA: If in Stock: around 3 days after payment. Mass production: around 20~25 days after receipt of deposit (Accurate delivery time depends on specific items and quantities) |
Q6: How about the transportation? |
GA: You can choose any mode of transportation you want, sea delivery, air delivery or door to door express |