Customized Steel Formwork for Viaduct Bridge Columns

Price $1050.00 Compare
Min Order 1 Ton
Shipping From Beijing, China
Popularity 319 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our steel formwork system is designed for strength and durability, ensuring it can be reused multiple times in construction projects. Its ease of assembly and erection makes it incredibly efficient. With its fixed shapes and structures, it is ideal for projects requiring numerous identical shapes, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. The total net weight of a loaded container typically ranges from 22 tons to 25 tons, a detail to be confirmed before loading.
2. We utilize various packaging methods depending on the product:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallets: Smaller parts are packed in bags and placed on pallets.
---Wooden Cases: Available upon customer's request for additional protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production time: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation time: This varies depending on the destination port.
3. Special requirements: Negotiations are needed for any special conditions.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with our own two factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.

Q3: What can you do for us?
A: We provide expert suggestions, comprehensive drawings of formwork layouts, and competitive quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.

Q4: How long does it take to prepare a brief design and quotation once we provide the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products required.

Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA