electrode plate
New Energy
RoHS, UR, ISO, CE, CCC
New
Low
Air Purification Components
Gas Manufacturing
Hydrogen
Large
SZYT
Wooden Box
1500mm
China
Product Description
Green hydrogen equipment manufacturing and
core material preparation technology
Electrode plate production workshop phase I covers an area of 20,000 square meters, registered on February 28, 2022, trial production in June 2022. In October, it reached 50 tablets per day. the installation of the newly introduced equipment completed in June 2023, Annual production of 100,000 tablets could be reached in 2024.
Technical quality personnel: 6 R & D personnel, 8senior engineers,6 senior technicians, 4 quality engineers, 6 inspectors.

Electrode plate production workshop phase I covers an area of 20,000 square meters, registered on February 28, 2022, trial production in June 2022. In October, it reached 50 tablets per day. the installation of the newly introduced equipment completed in June 2023, Annual production of 100,000 tablets could be reached in 2024.
Technical quality personnel: 6 R & D personnel, 8senior engineers,6 senior technicians, 4 quality engineers, 6 inspectors.
















