Online Technical Support
Single-Acting
Vane Pump
Dosing Pumps
No Leak
CE, ISO
KST or OEM
Wooden Case
Zhejiang, China
8413603190
Product Description
All of our products certificate with ISO9001. High pressure and high performance dowel pin type vane pumps T6 T7 are widely used for plastic machinery, casting machinery, metal machinery, pressing machinery, refining machinery, construction machinery, marine machinery , heavy machinery and transportation field.


workshop




1.30%deposit ,and 70%blanced by T/T before delivery
2.L/C at sight
Trade term
EXW,FOB Shanghai/Ningbo
PACKAGING
1.Brand "KST",neutral or the label as customers required.
2.Neutral carton with polyfoam, or packaging as customers required.
3.shipped with pallet. Before delivery,we will check each item one by one.
Delivery Time
We have large quantity stock of pump,cart kit and spare parts,the leading time will be in 3 days
And the detail leading time depend on the quantity.


Model Descriptions:
Cartridge kit of double pump | T6DC | -45 | R | 1 |
Cartrldge name | Series | Flow code | Rotation | Sealing Level |
Cartridge kit of single pump Cartidge kit of double pump treble pump shaft end Medlum cartridge kit of treble pump Cartridge Kit of double pump treble pump cover end | T6C, T6CC, T6DC,T6EC, T6DCC,T6DDCS, T6EDC(S) | 03, 05, 06, 08,10,12, 14,17,20, 22,25,28,31 | (viewed fromshaft end ofpump)right hand for clockwiseleft hand for counterclockwise | NBR Nitrile rubberFluororubber |
T6D, T6DC, T6ED,T6DCC, T6DDCS.T6EDC | 14, 17, 20, 24, 28,31,35, 38, 42, 45,50, 61 | |||
T6E, T6EC,TEED, T6EDC (S) | 42, 45, 50, 52, 57,62, 66, 72,85 |





Exhibition



FAQ
Payment term1.30%deposit ,and 70%blanced by T/T before delivery
2.L/C at sight
Trade term
EXW,FOB Shanghai/Ningbo
PACKAGING
1.Brand "KST",neutral or the label as customers required.
2.Neutral carton with polyfoam, or packaging as customers required.
3.shipped with pallet. Before delivery,we will check each item one by one.
Delivery Time
We have large quantity stock of pump,cart kit and spare parts,the leading time will be in 3 days
And the detail leading time depend on the quantity.