Dinghao Auto High Speed Fixed Fingerless Type Single-Facer for Corrugation Line with Tungsten Coating Flute

Price $43000.00 Compare
Min Order 1 Piece
Shipping From Tianjin, China
Popularity 377 people viewed
Quantity
+-
 

Tianjin Zhono Import & Export Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
SF-DN
Engineer Guides, Debugs and Video Instruction
3 Years
New
ISO 9001:2008, GB/T19001-2008
Automatic
Recycled Material, Paper
Normal Specification Paper
Steam
Fully
Tungsten or Chrome Coating
Stainless
Inner Suction
Frequency Type
HMI with PLC System
Grey or Ivory White
Ding Hao
Film Wrapping, Wire Fixing, Oiling and Tray
Steam Heating
Dongguang County, Cangzhou City, Hebei, China
8439300000
Product Description
Product Description

 

Detailed Photos
Product Parameters
Specification/ModelSF-DN15SF-DN12SF-DN10SF-DN08
Dia of Flute RollerØ320mmØ290mmØ280mmØ270mm
Working Width1400mm-2200mm1400mm-2200mm1400mm-2200mm1400mm-2200mm
Max Speed150m/min120m/min100m/min80m/min
Heating MethodSteam, Electricity, Oil and Natural Gas
  • The fingerless stationery single facer adopts adsorption for paper guide to keep flute stability at high speed.
  • The fingerless type SF will show its advantage when producing small flute like E, G and G. And the evenness and side pressure will be improved by adopting sloping slit.
  • The flute paper is adsorbed to the middle flute roller to form a negative pressure zone of 180°and then to finish flute rolling through vacuum box by fan.
  • The width of suction slot of lower corrugated roller is not more than 2.0, greatly reducing the stripe mark on single-sided corrugated sheet.
  • It adopts universal joint drive to separate the vibration source, which makes the maintainability higher, the transmission more stable and the operation more reliable.
  • The gear box adopts oil bath lubrication and closed gear transmission for vibration reduction.
  • It adopts auto-cycle glue supply, pneumatic gluing and releasing for better buffering effect.
Packaging & Shipping

 

FAQ

1. Are you manufacturer or trading company?
We a combination of manufacturer and trading company.

2. What is the payment term you accept? 
We usually accept T/T. DP and LC are also ok for us.
We need 30% payment as deposit to arrange production and the balance should be paid before shipping.

3. What is your leading time in average? How much time needs for installation?
The manufacturing period for production line is 150 days since deposit is received and installation period is around 30 days.


4. How do we install and debug machine?
Engineer guides installation and debug machine via video or on site.

5. Where is factory? How can we visit there?
Factory is at Mianfang Road 36, Dongguang County, Cangzhou City, Hebei Province, China.
It is near to Beijing and Tianjin, so after you get Beijing or Tianjin airport, we will pick you up to factory.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA