Dnv 2.7-1 Standard 12 16 Offshore Bottle Rack with Dnv Sling

Price $3000.00 Compare
Min Order 1 Piece
Shipping From Tianjin, China
Popularity 385 people viewed
Quantity
+-
 

Tianjin LongTeng International Trade Co., Ltd.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
OFFBR
JIS
Rack
Multi-Level Racking
Mobile
5-15m
2500 Kg
for Special Purpose
-20 Degree Celsius
1 PC
Yes
12/16 Cylinder Gas Bottle
Dnv 2.7-1 & En 12079 Standard
Non Package
5ft
China
73110090
Product Description

DNV 2.7-1 Standard 12 16 Offshore Cylinder Racks


Offshore cylinder racks  are designed to carry cylinders bottles. There are several types for 12/16/8 cylinders. 
It could be customized design. DNV sling is available if request. Optional type: 4 legs/5 legs.


Material: JIS SPA-H/ GB Q345D,E36
Surface Treatment: painted / galvanized with high anti-corrosion performance & compliant with environment protect trend.
Standard:  DNV2.7-1:2006 and EN12079-2006 Standard
Design Temperature: -20 °C/-40 °C
For Cylinder Type: Oxygen, DA, Argon. CO2 etc
Comes in Multiple Storages Capacity: 4/6/8/12/16/24 cylinder racks 



Offshore Gas Bottle Racks Photos 



Painted Gas Bottle Racks 


Offshore Gas Bottle Rack Dimension 
 Dimensions MM FT
External Length1,4504'9"
Width1,2404'1"
Height2,2507'4"
Internal Length1,2003'11"
Width1,0203'4"
Height1,9806'6"
Inside Cubic Capacity CU.MCU.FT
2.4285
 KGLB
Maximum Gross Weight3,3207,320
Tare Weight 8201,810
Maximum Payload 2,5005,510

LR Certificate of Offshore Containers



FAQ:
Q: Can I get 1 pc of offshore cylinder gas bottle rack? 
A: Sure. One sample is available. 

Q: How can you ensure your quality? Any approval?
A: Our offshore gas bottle rack is designed and fabricated according to DNV 2.7-1 and EN 12079 standard. It have approval the ISO standard and classification society. 


Q: What about the payment terms?
Our payment term is based on your order amount.
Usually we accept 40%TT in advance, the balance before shipment. 

Q: What about delivery date?
This is basis on the quantity you ordered. Usually it takes 45 days to fabricate and approval for CSC certificate. 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA